wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Road Geometric Design

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

The minimum stopping sight distance (SSD) on a level road depends mainly on:

a)

Speed and braking distance

b)

Speed and gradient only

c)

Speed, reaction time, and braking distance

d)

Speed, pavement type, and shoulder width

2.

If the speed of a vehicle is doubled, the stopping sight distance will:

a)

Double

b)

Increase four times

c)

Remain the same

d)

Increase eight times

3.

Which of the following is most critical for the design of overtaking sight distance (OSD)?

a)

Driver's reaction time

b)

Speed differential between overtaking and overtaken vehicles

c)

Road camber

d)

Vehicle acceleration only

4.

The headlight sight distance on a road is usually considered equivalent to:

a)

Overtaking sight distance

b)

Intermediate sight distance

c)

Stopping sight distance

d)

Safe braking distance

5.

Superelevation is provided on horizontal curves to:

a)

Reduce centrifugal force

b)

Counteract the effect of centrifugal force

c)

Reduce friction between tyres and pavement

d)

Increase vehicle speed

6.

The minimum radius of a horizontal curve depends on:

a)

Vehicle length and road gradient

b)

Design speed, superelevation, and side friction

c)

Road camber and lane width

d)

Traffic volume and vehicle acceleration

7.

Transition curves are provided in horizontal alignment to:

a)

Connect two straight roads directly

b)

Provide gradual introduction of centrifugal force

c)

Reduce the pavement cost

d)

Avoid overtaking on curves

8.

The camber provided on the road surface is mainly for:

a)

Increasing sight distance

b)

Reducing pavement thickness

c)

Facilitating drainage of rainwater

d)

Providing comfort to the driver

9.

The shoulder on a highway cross-section is meant for:

a)

Parking of vehicles

b)

Emergency use and lateral support to pavement

c)

Increasing carriageway width for traffic

d)

Aesthetic purpose only

10.

The right of way (ROW) in a highway cross-section refers to:

a)

Width of the carriageway only

b)

Total land acquired for the road, including shoulders and drains

c)

Distance between the two carriageway edges

d)

Lane width plus median width