SPMIG Categories, 3M Instructions, and MRC Periodicity Ranges

Total questions: 75

Worksheet time: 38mins

Name
Class
Date
1.

When using OMMS-NG what is used to identify an individual work candidate?

a)

Job Sequence Number

b)

Work Order Number

c)

Asset Tag

d)

Maintenance Code

2.

Who manages the user log-on ID's for all MDS users?

a)

3-M Coordinator

b)

System Administrator

c)

Security Officer

d)

Division Officer

3.

Who maintains the 13 Week Report (Accountability Log) (when SKED is down)?

a)

Workcenter supervisor

b)

Division Officer

c)

Maintenance Officer

d)

Department Head

4.

Who is responsible for performing assigned scheduled maintenance requirements?

a)

Maintenance Person

b)

Supervisor

c)

Inspector

d)

Manager

5.

Upon completion of the maintenance requirement, the maintenance person takes what action?

a)

Mark complete (X) in SKED and input member's PIN

b)

Notify the supervisor verbally

c)

Leave the task sheet blank

d)

Send an email to the maintenance chief

6.

Should a maintenance person review an MRC prior to performing the maintenance?

a)

Yes

b)

No

c)

Only if instructed by a supervisor

d)

Only after completing the maintenance

e)

Only for major repairs

7.

What initial action should the Maintenance person take if a tool cannot be located for accomplishing MRC?

a)

Should contact Workcenter Supervisor

b)

Should ignore the missing tool and proceed

c)

Should borrow a tool from another department without permission

d)

Should attempt to fabricate a replacement tool

8.

What are the purpose(s) of a spot check?

a)

Training, Validate the 3M Program, Check the knowledge level of the maintenance person, verify maintenance is being accomplished

b)

To increase the number of maintenance tasks

c)

To reduce the number of personnel required

d)

To eliminate the need for documentation

9.

How many weeks back does the 3MC archive Equipment Validations?

a)

13

b)

4

c)

8

d)

20

10.

What color is a classified MRC?

a)

Pink

b)

Blue

c)

Green

d)

Yellow

11.

Who should be the first point of contact for a work candidate?

a)

Workcenter Supervisor

b)

Human Resources Manager

c)

Team Member

d)

Project Coordinator

12.

What on MRC's indicates, when operating procedures are not followed correctly damage to equipment may result?

a)

Caution

b)

Warning

c)

Note

d)

Alert

13.

What 2 types of maintenance are there?

a)

Preventative, Corrective

b)

Scheduled, Unscheduled

c)

Mechanical, Electrical

d)

Routine, Emergency

14.

Who is the ship's 3M manager?

a)

Executive Officer

b)

Command Master Chief

c)

Supply Officer

d)

Engineering Officer

15.

Who is responsible for ensuring MRC's are verified, complete, applicable and correct?

a)

Maintenance Person

b)

Supervisor

c)

Quality Inspector

d)

Operations Manager

16.

What is the purpose of the 3M System?

a)

To achieve maximum equipment operational readiness through preventative maintenance

b)

To reduce the number of personnel required for maintenance

c)

To increase the cost of equipment repairs

d)

To eliminate the need for operator training

17.

When the first two digits of the MRC control number are underlined what is indicated?

a)

New or Revised MRC

b)

Classified MRC

c)

Obsolete MRC

d)

MRC for Special Equipment

18.

What is the purpose of the LOEP?

a)

Lists all applicable MIPs for a particular work center

b)

Identifies the location of emergency equipment

c)

Describes the maintenance procedures for all equipment

d)

Schedules training sessions for personnel

19.

On the MRC in the rate block when can you not substitute rates or qualifications?

a)

When an NEC is listed

b)

When the rate is below minimum wage

c)

When the employee is part-time

d)

When overtime is not authorized

20.

What is the PMS-5 report?

a)

LOEP

b)

Maintenance Index Page

c)

Equipment Guide List

d)

Change Request Form

21.

How do you verify an MRC?

a)

MRC-MIP-LOEP-Change Page or Change Page-LOEP-MIP-MRC

b)

MRC-LOEP-MIP-Change Page

c)

Change Page-MIP-LOEP-MRC

d)

LOEP-MRC-Change Page-MIP

22.

What do warnings on an MRC indicate?

a)

Danger to personnel

b)

Routine maintenance required

c)

System operating normally

d)

Low battery level

23.

In the SYSCOM control number, 02 23X N, what does the 'N' indicate?

a)

No repair parts required

b)

New item

c)

Non-standard part

d)

Needs inspection

24.

Where are Safety Precautions for a specific check listed?

a)

MRC Safety Precautions Box

b)

Maintenance Logbook

c)

Tool Inventory Sheet

d)

Operator's Manual

25.

Which of the following SYSCOM Control Numbers is the most recent?

a)

99 FISH N

b)

97 FISH N

c)

87 FISH N

d)

65 FISH N

26.

What is the source of general safety precautions for forces afloat?

a)

OPNAVINST 5100.19 Series

b)

NAVPERS 15665I

c)

NAVSUP P-485

d)

NAVSEA OP 3565

27.

How do you verify if the maintenance person has the correct tools and materials to accomplish a maintenance requirement?

a)

SPMIG

b)

Maintenance Logbook

c)

Work Order Summary

d)

Safety Data Sheet

28.

Where can you identify personal protective equipment required to accomplish maintenance requirements?

a)

HMUG or MSDS

b)

Technical Orders

c)

Work Schedules

d)

Equipment Labels

29.

Who is responsible for scheduling weekly Work Center maintenance and supervising its proper accomplishment?

a)

Workcenter Supervisor

b)

Maintenance Technician

c)

Operations Manager

d)

Safety Officer

30.

What is the periodicity of a 2M-1?

a)

Every 2 months

b)

Every 1 month

c)

Every 6 months

d)

Every year

31.

Who is the program manager of the 3M System?

a)

XO

b)

CO

c)

CMC

d)

DIVO

32.

How does the maintenance person sign for a check when it has been completed?

a)

Complete symbol (X) and sign with SKED PIN

b)

Initials only

c)

Date and time only

d)

Supervisor's signature required

33.

When satisfied that the work has been fully accomplished who "X's" off the maintenance requirement?

a)

Maintenance person assigned to the maintenance

b)

Supervisor of the maintenance team

c)

Quality assurance inspector

d)

Operations manager

34.

Who is responsible for safety in any maintenance evolution?

a)

Everyone

b)

The supervisor only

c)

The safety officer only

d)

The maintenance chief only

35.

A maintenance person determines which checks he/she is assigned by looking at what?

a)

SKED Workcenter maintenance schedule

b)

Maintenance supervisor's personal notes

c)

Random equipment logs

d)

Daily weather report

36.

What type of Feedback report is required for unsafe conditions found in the performance of PMS?

a)

Hazardous

b)

Routine

c)

Maintenance

d)

Operational

37.

What is the only block of the Maintenance Requirement Card that the WCS can deviate from without obtaining permission from higher authority?

a)

Tools, Parts, Materials, Test Equipment

b)

Procedure Steps

c)

Safety Precautions

d)

References

38.

How long is the accountability log maintained?

a)

Never, everything is annotated and archived in SKED

b)

For 1 year after completion

c)

For 6 months after completion

d)

Until the next audit cycle

39.

The responsibility for preparation of all 3M documentation for a particular workcenter falls on whom?

a)

Workcenter Supervisor

b)

Division Officer

c)

Maintenance Officer

d)

Commanding Officer

40.

What does MDS stand for and what system does DDG 59 use for its MDS?

a)

Maintenance Data System / OMMS-NG

b)

Mission Data System / RAST

c)

Mechanical Data System / SNAP

d)

Maintenance Display System / NTCSS

41.

Who produces all PMS related materials ie MIP's, LOEP's, MRC's

a)

NAVSEASYSCOM

b)

NAVSUP

c)

NAVFAC

d)

NAVSEA

42.

If a maintenance requirement is assigned to more than one person, who is responsible for signing the accountability log, or mark complete in SKED, for completion of the maintenance requirement?

a)

The senior person

b)

Any person assigned

c)

The person who started the task

d)

The supervisor on duty

43.

What does SPMIG Category I stand for?

a)

Materials

b)

Test Equipment

c)

Tools

d)

Misc

44.

What does SPMIG Category II stand for?

a)

Parts

b)

Misc

c)

Materials

d)

Tools

45.

What does SPMIG Category IV stand for?

a)

Tools

b)

Misc

c)

Parts

d)

Test Equipment

46.

What is the description for 3M Instruction 4790.3?

a)

Ship’s Maintenance and Material Management (3M) Manual

b)

Joint Fleet Maintenance Manual (JFMM)

c)

Surface Force Maintenance and Material Management (3M) & Certification Program

d)

Ship’s Maintenance and Material Management (3M) System Policy

47.

Fill in the blank: MRC periodicity range for M is ____ days.

a)

21 - 43

b)

10 - 20

c)

44 - 60

d)

5 - 15

48.

Fill in the blank: MRC periodicity range for Q is ____ days.

a)

61 - 121

b)

30 - 60

c)

122 - 180

d)

10 - 30

49.

Fill in the blank: MRC periodicity range for S is ____ days.

a)

122 - 242

b)

100 - 150

c)

200 - 300

d)

50 - 100

50.

Fill in the blank: MRC periodicity range for A is ____ days.

a)

270 - 450

b)

100 - 200

c)

500 - 700

d)

50 - 100

51.

What is Status I IEM?

a)

Equipment scheduled for overhaul for 30 days or greater

b)

Equipment scheduled for overhaul for 7 days or greater

c)

Equipment not scheduled for overhaul for 30 days or greater

d)

Equipment not scheduled for overhaul for 7 days or greater

52.

Which of the following periodicities is a non-calendar periodicity?

a)

2M-30

b)

2W-1

c)

2W-M

d)

R-1W

53.

Who can complete weekly close out of maintenance in the absence of the DIVO?

a)

WCS

b)

LCPO

c)

DTI

d)

LCPO

54.

A maintenance requirement that must be accomplished concurrently with another maintenance requirement?

a)

Corrective Related Maintenance

b)

Omitted Maintenance

c)

Scheduled Maintenance

d)

Mandatorily Related Maintenance

55.

This event is based on the current value of a measurement in relation to the value at the time of the last accomplishment?

a)

Metered Event

b)

Triggered

c)

Required Maintenance

d)

Scheduling Aid

56.

Who has the responsibility for establishing a climate where PMS accomplishment is a command wide priority and where command leadership is familiar with 3-M program requirements?

a)

Executive Officer

b)

Commanding Officer

c)

SMC

d)

TYCOM

57.

What does FBR stand for?

a)

Feed Back Report

b)

Find Boat Report

c)

Fuel Boat Recovery

d)

Feed Back Review

58.

The intentional placement of a piece of equipment/system out-of-service with no intention of reactivating the equipment/system is defined as what?

a)

Out of Commission

b)

Deactivated Equipment

c)

Out of Calibration

d)

Inactive Equipment List

59.

Who is responsible for reviewing PMS assignments to ensure that qualified personnel perform quality maintenance IAW workcenter schedules?

a)

Commanding Officer

b)

Department Head

c)

Work Center Supervisor

d)

Maintenance Person

60.

If a maintenance periodicity identifies days or months, who should schedule the maintenance?

a)

Authorizing Officer

b)

LPO

c)

LCPO

d)

Department Head

61.

Who is the ship's 3M System Manager?

a)

3M Officer

b)

3M Coordinator

c)

XO

d)

CO

62.

Who is responsible for reviewing, and initialing the line outs on the Work Center LOEPs, MIPs, and KaCheck reports?

a)

LCPO

b)

WCS

c)

TYCOM

d)

3MC

63.

What provides a listing of the MIPs for systems and equipment assigned to each Work Center, and systems and equipment not requiring PMS or currently being evaluated for PMS?

a)

List of Effective Pages

b)

Change Page

c)

Maintenance Requirement Card

d)

Advanced Change Notice

64.

What is designed to provide a ready reference of planned maintenance requirements which will be retained in the working area for use by the Work Center Supervisor and maintenance personnel?

a)

Work Center PMS Manual

b)

3M Gazette

c)

Tagout User Manual

d)

HMUG

65.

What type of tag would be used as a precautionary measure to provide temporary special instruction or to indicate that unusual action must be exercised to operate equipment?

a)

Caution

b)

Temporary

c)

Laminated

d)

Danger

66.

Which of the following is NOT a required periodicity for a spot check?

a)

Before the Commanding Officer or repair activity is to board the ship

b)

Monitor the quality of the 3M System program in the ship

c)

Check periodic 3-M System screening visits by Department Head and the 3M System Coordinator

d)

Casualty Reports

67.

Which instruction describes the requirements for HAZMAT control labeling?

a)

OPNAVINST 4790.2 (series)

b)

OPNAVINST 5100.19 (series)

c)

COMNAVSEAINST 4790.1 (series)

d)

OPNAVINST 5100.19 (series)

68.

What are the categories of periodicities?

a)

Calendar, Non-calendar, and Inactive Equipment Maintenance

b)

Scheduled, Planned, and Routine

c)

LU, PM, SU

d)

Calendar, IEM, and Scheduled

69.

Which of the following is NOT listed on the List of Effective Pages?

a)

FR Number

b)

Situational Requirement Report

c)

Work Center

d)

Unit Identification Code (UIC)

70.

What is the purpose of a Maintenance Requirement Card?

a)

Provide detailed procedures for performing maintenance requirements

b)

To list the various requirements a piece of equipment needs for corrective maintenance

c)

To give step by step procedures for repairing broken equipment

d)

To indicate what equipment requires maintenance

71.

Once inspection requirements have been verified, prior to conducting maintenance, what is the first step to ensure safety?

a)

Remove safety devices from the electrical tool item

b)

Zone inspection

c)

Feed Back Report

d)

A current listing of the CCOL

72.

Which day must all maintenance be closed out for the week?

a)

First sunday of the week

b)

Work not ready

c)

Every Sunday

d)

Every Sunday of this week

73.

What reference is designed to provide the user with a ready reference for all aspects concerning the 3-M program?

a)

CINCLANTFLTINST 4790.3

b)

OPNAVINST 5100.19E

c)

NAVSEAINST 4790.4C

d)

OPNAVINST 4790.4D

74.

Whose responsibility is it to review schedules ensuring maintenance is level loaded and not scheduled to avoid assessment?

a)

3MC

b)

XO

c)

Division Officer

d)

Maintenance Person

75.

What does IMA stand for?

a)

Implementing Maintenance Activity

b)

Intermediate Maintenance Activity

c)

Internal Management Action

d)

Intermediate Management Accountability