Manajemen Proyek di Industri Fabrikasi

Total questions: 29

Worksheet time: 10mins

Name
Class
Date
1.

What is a project?

a)

A project is a routine activity.

b)

A project is a series of temporary activities.

c)

A project is a permanent endeavor.

d)

A project is a repetitive process.

2.

Why is project management necessary?

a)

To ensure projects are completed on time.

b)

To manage technical complexities.

c)

To reduce operational risks.

d)

All of the above.

3.

What is the main role of a Project Manager?

a)

To oversee the project.

b)

To manage the budget.

c)

To coordinate the team.

d)

All of the above.

4.

What is a key characteristic of project timelines?

a)

They are flexible and can change

b)

They are clearly defined in contracts

c)

They are not important

d)

They are based on operational routines

5.

What does cost overrun in a project lead to?

a)

Increased profits

b)

More resources

c)

Penalties or significant losses

d)

Faster project completion

6.

What is a unique result of projects in fabrication?

a)

Standardized output

b)

Unique designs and specifications

c)

Repetitive processes

d)

Operational efficiency

7.

What is a challenge faced in fabrication projects?

a)

High efficiency

b)

Strict adherence to international standards

c)

Low risk

d)

Standardized output

8.

What is the difference between projects and routine operations?

a)

Projects are repetitive

b)

Routine operations are unique

c)

Projects are one-off activities

d)

Routine operations are time-bound

9.

What are the main functions of project management?

a)

Planning, Organizing, Executing, Controlling, Closing

b)

Budgeting, Scheduling, Reporting

c)

Designing, Implementing, Evaluating

d)

Researching, Developing, Marketing

10.

What does the Triple Constraint in project management refer to?

a)

Scope, Time, Cost

b)

Quality, Risk, Resources

c)

Stakeholders, Communication, Documentation

d)

Planning, Execution, Closure

11.

Why is project management very important in the fabrication industry?

a)

High Project Complexity

b)

Quality Standards Demand

c)

Risk of Delays & Penalties

d)

Multi-Stakeholder Coordination

12.

What are the general characteristics of fabrication projects?

a)

Unique and Complex

b)

Product-Oriented

c)

Bound by Triple Constraint

d)

Multidisciplinary and Multi-Stakeholder

13.

What standards must fabrication products meet?

a)

Only local standards

b)

ASME, AWS, API, ISO, or DNV

c)

No standards required

d)

Any standards the contractor chooses

14.

What are the risks associated with fabrication projects?

a)

No risks involved

b)

Only financial risks

c)

Technical defects, operational delays, safety accidents

d)

Only risks related to materials

15.

What is the impact of late material delivery?

a)

Improves project efficiency

b)

No impact at all

c)

Only affects the budget

d)

Delays the entire project schedule

16.

What is the main difference between projects and mass production?

a)

Projects are temporary with a specific end, while mass production is continuous

b)

Both are the same

c)

Projects are more efficient than mass production

d)

Mass production has a specific end

17.

What is mass production?

a)

A one-time project

b)

A repetitive manufacturing process producing standard products in large quantities

c)

Only applicable to construction

d)

A method for custom products

18.

What is the lesson learned from the case of the pressure vessel failing hydrotest?

a)

Repairs are always quick

b)

Quality control is not necessary

c)

Only final inspections are important

d)

Quality control must be implemented from the start

19.

What should project managers prepare for late material deliveries?

a)

Contingency plans with alternative vendors

b)

No preparation needed

c)

Only focus on the current vendor

d)

Ignore the issue

20.

What are the challenges in project management in fabrication?

a)

Time management is crucial with penalty clauses.

b)

Many parties are involved including owners and contractors.

c)

Compliance with varying technical standards.

d)

All of the above.

21.

What is the role of a Project Manager in fabrication?

a)

To lead the team towards project goals.

b)

To manage only administrative tasks.

c)

To focus solely on technical aspects.

d)

To act as a liaison between clients and teams.

22.

What is the main responsibility of a Project Manager in planning?

a)

To supervise the workers.

b)

To create a scope of work and schedule.

c)

To only manage the budget.

d)

To ensure quality control.

23.

What are the main responsibilities of a Project Manager?

a)

Scope Management, Time Management, Cost Management, Quality Management, Risk Management, Communication Management

b)

Only Time Management and Cost Management

c)

Only Quality Management and Risk Management

d)

None of the above

24.

What challenges does a Project Manager face in Batam?

a)

Only high operational costs

b)

Only conflicts with subcontractors

c)

Tight deadlines and material delays

d)

None of the above

25.

What technical competencies are required for a Project Manager?

a)

Only communication skills

b)

Only knowledge of project management software

c)

Understanding of engineering processes

d)

None of the above

26.

What is the impact of late material delivery on a project?

a)

It can improve project quality

b)

It has no impact

c)

It can cause project delays

d)

None of the above

27.

What should a Project Manager do if there is a quality defect?

a)

Ignore it

b)

Ensure QC and NDT are performed early

c)

Only report it to the client

d)

None of the above

28.

What is the role of a Project Manager in communication management?

a)

To be the central point of communication for all stakeholders

b)

To only communicate with the client

c)

To avoid communication

d)

None of the above

29.

A pressure vessel fabrication project had to undergo repair welding due to cracks found during hydrostatic testing. What corrective actions were taken?

a)

Conduct a root cause analysis with the QC team.

b)

Prepare a repair schedule without disrupting other work.

c)

Maintain open communication with the client.