WorksheetsIDD unit 1-4
Total questions: 27
Worksheet time: 53mins
What does IDD stand for?
Integrated Data Delivery
Integrated Digital Delivery
Integrated Design Delivery
Integrated Drawing Delivery
IDD builds on which two earlier initiatives?
BIM & BCA
BIM & HDB
BIM & MOE
BIM & VDC
What is the main purpose of IDD?
To integrate work processes and connect stakeholders
To create architectural drawings
To develop software
To regulate construction permits
Which authority promotes IDD in Singapore?
HDB
PUB
BCA
URA
IDD supports which national initiative?
Smart Nation Plan
Construction Industry Transformation Map (ITM)
Green Building Masterplan
Singapore Digital Economy Framework
The key concepts of IDD are mainly about:
Regulations and Compliance
Integration and Digitalization
Safety and Health
Cost and Profit
Integration in IDD focuses on:
Separating stakeholder
Streamlining processes and connecting stakeholders
Design only
Construction only
Digitalization in IDD means:
Using paper documents
Implementing digital tools, data and platforms
Reducing file sizes
Working offline
Which of the following is NOT a key concept of IDD?
Integration
Digitalization
Fabrication
Streamlining
Which of the following is NOT a discipline of BIM model?
Architectural
Civil & Structural
Mechanical & Electrical
Project Management
Which one of the following best describes the concept of “Rehearse what is to be built and build what was modelled” in the BIM workflow?
Building physically twice for verification
Building virtually first, then physically.
Building two identical models for approval
Building with two different contractors
Physical mock-ups incur costs to the overall sum of the project because they are
Cheap and easy to build
Constructed at the project site.
Developed using BIM models
Created during the design phase
In the project initiation phase, clients set the framework for
BIM implementation and virtual mock-up requirements.
Physical mock-up testing and approvals.
VR headset installation.
Digital fabrication and scheduling
During the design development phase, consultants and designers create
Physical mock-ups on-site.
Detailed BIM models alongside the building’s design.
Material samples for VR experience.
Construction scheduling timelines.
Which one of the following softwares is developed by Autodesk for reviewing 3D models and drawings?
AutoCad.
Fusion.
Navisworks.
Revit.
One of the key benefits of Navisworks is it
is an authoring software.
develops any native BIM file formats.
supports a wide range of file formats.
constructs any native BIM file formats.
One of the file formats of Navisworks is
*.nwa.
*.nwb.
*.nwd.
*.nwe.
The main contractor refines the BIM models into final virtual mock-ups during
Design development phase.
Operation phase.
Construction phase.
Maintenance phase.
What is the benefit of using virtual mock-ups for project? clue: Man (a)
Which one of the following steps is to dock a window in Navisworks?
Click ‘pin’ logo.
Choose ‘settings’.
Checked the option box.
Select ‘display’ dropdown list.
Name two types of sectioning methods in Navisworks.
State two categories of file formats in Navisworks.
1. In the Design Phase, tools like Revit and ArchiCAD help _________ and _________ 3D models. These tools allow teams to develop ____ designs and check for any issues early on.
1. State the purpose of advertisement boards at site perimeters and its benefits.
Scenario: Digital Transformation in Building Maintenance
You are part of the Facilities Management (FM) team at Green Rise Business Tower, a 15-storey commercial complex completed two years ago. The building was designed and constructed using Building Information Modelling (BIM) and has now adopted the Integrated Digital Delivery (IDD) framework to strengthen coordination and operational efficiency.
Under this new initiative, the management aims to link the existing BIM model with a Computerized Maintenance Management System (CMMS). This integration will enable real-time data sharing between the maintenance team, cleaning contractors, and system vendors, providing greater visibility of asset performance and maintenance schedules.
Through this digital transformation, Green Rise Business Tower is embracing IDD’s core philosophy — integrating work processes and connecting stakeholders through digital technologies.
In the FM phase, this allows seamless access to accurate as-built BIM data, which supports maintenance planning, real-time monitoring, and data-driven decision-making.
The team recognizes that IDD is built upon the foundation of BIM and VDC, both of which promote collaboration and visualization throughout the project lifecycle. IDD extends these ideas by integrating digital tools, data, and processes beyond the construction stage — into daily building operations and asset management. Two of IDD’s key concepts are strongly demonstrated here:
1. Integration of Streamlined Processes – BIM and CMMS are digitally connected, allowing smooth information flow among the maintenance team, service contractors, and vendors.
2. Digital Solutions to Stakeholders – The FM team uses digital dashboards, asset models, and data analytics to visualize system performance and schedule preventive actions efficiently.
The BIM model plays a central role in this IDD-driven process. It acts as a digital representation of all building assets, allowing facility managers to locate components, check specifications, review maintenance histories, and even link the model directly to the CMMS. This integration ensures that every asset—from chillers to lighting systems—is digitally traceable, promoting accuracy and accountability.
By implementing IDD in its FM operations, GreenRise Business Tower experiences several key benefits:
· Improved coordination among teams due to shared digital data and workflows.
· Enhanced visualization of MEP and architectural systems, enabling faster issue identification and more informed decision-making.
However, the project team also faces an initial challenge: adopting IDD requires investment in training, software licensing, and data migration from existing paper-based or legacy systems into digital platforms. Despite this, the long-term advantages — reduced downtime, improved asset performance, and data-driven maintenance — far outweigh the setup effort.
Explain how IDD supports the Facilities Management phase in the building lifecycle of GreenRise Business Tower
Identify two key IDD concepts that are being applied in this scenario and describe their relevance.
Explain how BIM models contribute to the success of the IDD implementation in this project.
List two benefits and one challenge of adopting IDD in the Facilities Management phase of Green Rise Business Tower.
Which one of the following Revit editing commands relocates
selected elements?
Delete.
Move.
Rotate
Scale
One of the graphic display options in shading commands is
density.
material.
section.
wireframe.