In construction planning, the procurement phase mainly includes —
Detailed design and WBS preparation
Bidding and tendering processes
Site mobilization and resource allocation
Dispute settlement and contract execution
Which dispute-settlement method involves two technical persons and one chairperson?
Adjudication
Dispute Review Board
Conciliation
Arbitration
The injury frequency rate is defined as —
Days lost per 1000 man-hours
Fatalities per year
Disabling injuries per lakh man-hours worked
Injuries due to physiological causes
In material management, FIFO ensures —
New stock is used first
Reduced quality
Older stock is used first
Increased storage cost
Conciliation is similar to mediation but the conciliator meets both parties separately.
True
False
Selective tendering results in lower prices than open tendering due to greater competition.
True
False
Assertion (A): Nomination (single tendering) often leads to lower contract prices. Reason (R): Because competition is eliminated and only one preferred contractor is invited. Choose the correct option.
A and R are true, and R is the correct explanation
A and R are true, but R is not the explanation
A is true, R is false
A is false, R is true
The construction phase comes after the (a) phase.
(a) float is defined as the time through which an activity can be delayed without affecting the succeeding and preceding activities.
EOQ depends on annual consumption (A), ordering cost (S), and _____ cost (I).
carrying
scrap
depreciation
transport
Arrange the following phases of a construction project in correct order
1) Procurement Phase 2) Close-out Phase 3) Pre-construction Phase 4) Construction Phase
(a)
Identify the odd one out.
Mediation
Conciliation
Arbitration
Activity-on-Node method
In PERT analysis, a critical activity has—————-float
(a)
Consider the statements: S1: Selective tendering ensures only capable firms submit tenders. S2: Selective tendering always gives the lowest tender cost. Choose the correct option.
Both correct
Both incorrect
S1 correct, S2 incorrect
S1 incorrect, S2 correct
The amount of time by which an activity can be delayed without affecting project completion time is:
(a)