wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Unit 105 Work Introduction

Total questions: 28

Worksheet time: 14mins

Name
Class
Date
1.

What is the primary purpose of the Unit 105 sample scheme of work described in the introduction?

a)

Provide a fixed timetable for all centres

b)

Offer a flexible example to guide delivery

c)

Replace practical workshops entirely

d)

Set mandatory assessments and grading

2.

Which statement best reflects how centres should use the sample scheme of work?

a)

Use it exactly as written without changes

b)

Follow only the theory sessions, omit practicals

c)

Adjust or extract content to suit delivery needs

d)

Copy sessions but remove health and safety

3.

Which themes are identified as essential to run through teaching for Unit 105?

a)

Advanced structural design codes

b)

British Values

c)

Spiritual, moral, social and cultural issues

d)

Health and safety considerations

e)

Use of information learning technology (ILT)

4.

How is this Health & Safety session structured on your timetable?

a)

Two hours per session weekly

b)

One and a half hours per session weekly

c)

One hour and 45minutes per session weekly

d)

One hour per session weekly

5.

What key message about health and safety should be impressed upon learners?

a)

Delegate all safety checks to supervisors only

b)

Preserve the health and safety of others and themselves

c)

Prioritise speed over safety on site

d)

Focus safety training solely on equipment use

6.

Which best describes the main focus of Unit 105 in construction and building services engineering?

a)

Protecting health, safety, and the environment

b)

Calculating structural load-bearing capacities

c)

Historic architecture styles across regions

d)

Advanced electrical circuit design techniques

7.

Which item is a workplace health and safety consideration specifically for working on site?

a)

Using welfare facilities and safe access routes

b)

Comparing project budgets with marketing spend

c)

Scheduling client meetings during lunch hours

d)

Selecting decorative finishes for client rooms

8.

Which principles are part of risk management in construction?

a)

Identifying hazards before tasks begin

b)

Assessing likelihood and severity of harm

c)

Ignoring near-miss reports to save time

d)

Implementing controls and monitoring effectiveness

9.

What should learners know about equipment in the built environment?

a)

Preferred brands chosen by the tutor

b)

Equipment types and associated risks on site

c)

Marketing features of new power tools

d)

Only hand tools used by carpenters

10.

Which statement aligns with environmental protection and waste management in construction?

a)

Complying with environmental regulations and permits

b)

Burning waste materials to reduce skip costs

c)

Preventing pollution through site management practices

d)

Segregating waste streams for disposal and recycling

11.

What is the safest and most responsible way to deal with general construction waste on a building site?

a)

Leave it in walkways until the end of the job

b)

Burn it on site to save time

c)

Place it in the correct labelled skips or containers for disposal

d)

Hide it behind a building so it’s out of sight

12.

Which activity is consistently used as a skills check across sessions 7 through 14?

a)

Classroom discussion

b)

Peer assessment discussion

c)

Individual oral presentation

d)

On-site practical demonstration

13.

For sessions 7 and 8 (3–6 hours), which set of worksheets is referenced for the skills check?

a)

Worksheets 8–12

b)

Worksheets 6–9

c)

Worksheets 10–14

d)

Worksheets 12–16

14.

In session 9 (3 hours), what is the specific worksheet used for checking skills?

a)

Worksheet 11

b)

Worksheet 20

c)

Worksheet 13

d)

Worksheet 15

15.

During session 10 (3 hours), which worksheet supports the skills check?

a)

Worksheet 14

b)

Worksheet 16

c)

Worksheet 18

d)

Worksheet 20

16.

Which pair of worksheets is linked to session 12 for skills checking?

a)

Worksheets 20 and 21

b)

Worksheets 16 and 17

c)

Worksheets 14 and 15

d)

Worksheets 18 and 19

17.

Which worksheets are associated with session 13 skills check?

a)

Worksheets 12 and 13

b)

Worksheets 18 and 19

c)

Worksheets 20 and 21

d)

Worksheets 16 and 17

18.

Which single worksheet is cited for session 14 skills check?

a)

Worksheet 20

b)

Worksheet 19

c)

Worksheet 18

d)

Worksheet 17

19.

Which action should be taken first after locating underground services during excavation?

a)

Backfill the trench and postpone work

b)

Switch off all site power immediately

c)

Notify site supervisor and mark service routes

d)

Continue digging with extra caution

20.

Which combination best describes safe management of site services?

a)

Decommissioning and documentation

b)

Protection and signage

c)

Identification and isolation

d)

Commissioning without testing

21.

What is a primary risk associated with working in confined spaces on construction sites?

a)

Noise levels from nearby machinery

b)

Limited visibility due to poor lighting

c)

Restricted access for heavy equipment

d)

Atmospheric hazards like low oxygen

22.

Which consequence can arise from constructing an unsafe building or product?

a)

Delayed inspections by authorities

b)

Higher initial material costs

c)

Increased maintenance staff morale

d)

Failure leading to injury or property damage

23.

When discussing areas of work with high risk, which measure is most appropriate for those areas?

a)

Reduce supervision to speed progress

b)

Put special safety measures in place

c)

Avoid risk assessments to save time

d)

Assign inexperienced workers for training

24.

Which practice best supports environmental protection on a construction site when dealing with mixed waste materials?

a)

Segregate waste streams for recycling or safe disposal

b)

Store waste long-term until the project finishes

c)

Place all waste in general skips without sorting

d)

Burn combustible waste on-site to reduce volume

25.

Which combination commonly contributes to air contamination on construction sites?

a)

Fumes from paints, solvents, and fuels

b)

Steam from kettles in the canteen

c)

Dust from cutting and demolition

d)

Smoke from engines and generators

26.

What is the primary reason to segregate construction waste such as timber, metals, and concrete?

a)

It speeds up daily toolbox talks for crews

b)

It prevents theft of valuable materials

c)

It enables recycling and reduces disposal hazards

d)

It satisfies marketing requirements for clients

27.

Which action most effectively reduces pollution generated by power tools and equipment?

a)

Use electricity, battery, and compressed air without checks

b)

Run engines continuously to avoid start–stop wear

c)

Operate tools indoors to limit neighborhood exposure

d)

Maintain equipment and use low-emission power sources

28.

A site team plans to limit airborne dust during demolition. Which set of measures is most appropriate?

a)

Dry sweeping debris to keep work fast

b)

Water suppression and local extraction

c)

Enclosing work areas and using PPE

d)

Delaying cleanup until the end of the project