MNGT 211 Finals

Total questions: 50

Worksheet time: 38mins

Name
Class
Date
1.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. A contractor plans Activity B but cannot start until Activity A finishes. Activity A = 5 days, Activity B = 6 days. This is an example of?

a)

Lag

b)

Float–Slack Relationship

c)

Float

d)

Merge node

2.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. A project requires 12 carpenters, but only 8 are available. The scheduler delays non-critical activities to free manpower. This is an example of?

a)

Crashing

b)

Resource leveling

c)

Fast-tracking

d)

Smoothing

3.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. A path in the network shows 15 days of duration and another path shows 21 days. The 21-day path is:

a)

Non-critical

b)

Parallel

c)

Critical

d)

Free float path

4.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. A BOQ item requires 150 mm slab quantity. The correct measurement basis is:

a)

Length

b)

Volume

c)

Area

d)

Weight

5.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. A supplier provides materials but 20% are below specification. According to project management flow, the engineer must first:

a)

Reject materials and notify contractor

b)

Replace materials

c)

Accept with penalty

d)

Include in punchlisting

6.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. The engineer discovers that a task is delayed by 3 days but has 3 days float. What should be done?

a)

Declare critical

b)

No effect on project

c)

Accelerate immediately

d)

Remove from schedule

7.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. A contractor proposes parallel execution of Activities D and E to shorten deadlines. This is:

a)

Crashing

b)

Fast-tracking

c)

Leveling

d)

Smoothing

8.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. A structure requires 240 m3m^3 of concrete. The BOQ quantity must come from:

a)

Shop drawings

b)

Plans and specifications

c)

Contractor estimate

d)

As-built drawings

9.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. A task has ES = 4 and Duration = 7 days. What is EF?

a)

10

b)

11

c)

12

d)

13

10.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. A 200 mm CHB wall is specified. The quantity take-off is based on:

a)

Length

b)

Area

c)

Per piece

d)

Volume

11.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. A scheduler finds Activities E and F require the same crane on the same day. This situation is a:

a)

Lag

b)

Resource conflict

c)

Float

d)

Overestimation

12.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. A project must be shortened by 3 days. Only one critical activity can be crashed. This means:

a)

Project must accept delay

b)

Non-critical activities can help

c)

Fast-tracking may be needed

d)

Float must be increased

13.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. A BOQ uses mm , m2m^2 , m3m^3 for quantities. Inconsistency leads to:

a)

Float overestimation

b)

Cost errors

c)

Schedule compression

d)

Safety risks

14.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. PERT uses:

a)

Deterministic time

b)

Probabilistic time

c)

Machine time

d)

Cost-based duration

15.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. CPM determines:

a)

Resources

b)

BOQ

c)

Critical path

d)

Cash flow

16.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. A dummy activity represents:

a)

Float

b)

Dependency

c)

Duration

d)

Equipment

17.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. WBS organizes work into:

a)

Labor list

b)

Work packages

c)

BOQ

d)

Equipment list

18.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. Resource smoothing aims to:

a)

Increase duration

b)

Reduce fluctuation

c)

Assign more workers

d)

Add constraints

19.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. Free float is:

a)

Delay without affecting successor

b)

Delay without affecting project

c)

Excess manpower

d)

Design float

20.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. A bar chart cannot show:

a)

Durations

b)

Critical path

c)

Sequence

d)

Start dates

21.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. Crashing increases:

a)

Time

b)

Cost

c)

BOQ

d)

Float

22.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. A merge node is:

a)

One activity splitting

b)

Several merging

c)

Dummy

d)

Float

23.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. Manpower is:

a)

Equipment resources

b)

Renewable resources

c)

Non-renewable

d)

Material

24.

Multiple Choice. Carefully read each question, then circle the correct answer. Avoid guessing as your incorrect answers will be deducted from your correct answers. Concrete is:

a)

Renewable

b)

Consumable

25.

BOQ stands for?

a)

Bill of quantities

b)

Budget order quantity

c)

Built-output quantity

d)

Basic order quotation

26.

A labor strike occurs during construction. The employer’s first step is to?

a)

Fire workers

b)

Negotiate

c)

Hire new workers

d)

Stop construction forever

27.

A grievance procedure is meant to?

a)

Determine pay

b)

Resolve disputes

c)

Fire employees

d)

Break unions

28.

The right to self-organization belongs to?

a)

Supervisors

b)

Rank-and-file workers

c)

Contractors

d)

Owners only

29.

A lockout is initiated by?

a)

Workers

b)

Management

c)

Government

d)

Safety committee

30.

A CBA is?

a)

Collective Bargaining Agreement

b)

Contractual Building Agreement

c)

Construction Budget Allocation

d)

Collective Bonus Agreement

31.

Illegal strike includes?

a)

Peaceful rally

b)

Strike without notice

c)

CBA negotiation

d)

Overtime refusal

32.

Union security clause means?

a)

Union must buy insurance

b)

Workers must join union

c)

Union must hire workers

d)

Union must dissolve

33.

A labor-only contractor.

a)

Has tools and equipment

b)

Provides only labor

c)

Is legitimate

d)

Is exempt from DOLE

34.

Good faith bargaining means?

a)

Delay negotiation

b)

Intent to reach agreement

c)

Refusal to negotiate

d)

Reject compromise

35.

DOLE’s role is to?

a)

File lawsuits

b)

Mediate labor disputes

c)

Ban unions

d)

Interfere in CBA

36.

A strike during a valid grievance process may be?

a)

Legal

b)

Illegal

c)

Encouraged

d)

Required

37.

A “yellow dog contract” means?

a)

No union membership allowed

b)

Free medical

c)

Guaranteed CBA

d)

High salary rule

38.

What RA 9184 requires the default mode of procurement?

a)

Negotiated procurement

b)

Direct contracting

c)

Shopping

d)

Competitive bidding

39.

The BAC is responsible for?

a)

Awarding the contract

b)

Conducting bidding

c)

Approving budget

d)

Designing plans

40.

ABC stands for?

a)

Approved budget for the contract

b)

Annual budget certification

c)

Allowable bidding cost

d)

Allocated bid charge

41.

Bid security ensures?

a)

Contractor willingness to participate

b)

Contractor does not withdraw bid

c)

Payment of taxes

d)

Penalty waiver

42.

Blacklisting applies to?

a)

Only to local agencies

b)

Nationwide

c)

Only to DPWH

d)

Barangays only

43.

Post qualification verifies?

a)

BOQ

b)

Lowest calculated bid

c)

Eligibility and capacity

d)

Penalties

44.

Shopping is allowed for procurement up to?

a)

50,000php

b)

100,000php

c)

500,000php

d)

1,000,000php

45.

Direct contracting is allowed when?

a)

Many suppliers exist

b)

No suitable brand alternative

c)

Prices vary

d)

No specification exists

46.

Two failed biddings allow?

a)

Direct contracting

b)

Negotiated procurement

c)

Emergency procurement

d)

Consulting services

47.

The HOPE is responsible for.

a)

Approving award

b)

Preparing BOQ

c)

Inspecting materials

d)

Designing the building

48.

A sealed bid means

a)

No staples allowed

b)

Confidential until opening

c)

Cannot be submitted early

d)

Must be notarized

49.

BAC secretariat handles?

a)

Preparation of bidding documents and minutes

b)

Technical design and cost estimates

c)

Contractor performance evaluation only

d)

Approval of awards and contracts

50.

Alternative methods must be?

a)

Cheaper

b)

Faster

c)

Justified and approved

d)

Random