Search Header Logo
CROSS BORDER AND BESS QUIZ

CROSS BORDER AND BESS QUIZ

Assessment

Presentation

Other

Professional Development

Practice Problem

Medium

Created by

Elliyani Farid

Used 10+ times

FREE Resource

0 Slides • 10 Questions

1

Multiple Choice

In LTM-PIP and LTMS-PIP, what does "PIP" actually stand for?

1

Power in Progress

2

Power Implementation Project

3

Power Integration Project

4

Please Import Power

2

Multiple Choice

Which of the following best describes a key technical challenge hindering the effective deployment of BESS in ASEAN countries?

1

High cost of solar panel installation

2

Lack of harmonized sizing standards and dispatch protocols for BESS integration

3

Inadequate demand for renewable energy in urban areas

4

Shortage of lithium resources in Southeast Asia

3

Multiple Choice

Which countries have wheeling agreements with Laos?

1

Malaysia and Singapore

2

Malaysia and Thailand

3

Malaysia and Vietnam

4

Thailand and Singapore

4

Multiple Select

Which of the following are common BESS applications in the Thailand ? (Select all that apply)

1

Water purification

2

Grid stabilization

3

Microgrids

4

Renewable Integration

5

Multiple Choice

Which country recently signed an agreement during the last ASEAN summit in May to export electricity to Malaysia?

1

Thailand

2

Laos

3

Vietnam

4

Cambodia

6

Multiple Choice

How much is the BESS capacity in Philippines across Luzon, Visayas, and Mindanao?

1

100 MW

2

250 MW

3

500 MW

4

1000 MW

7

Multiple Choice

Below are the challenges in cross-border power transfer across ASEAN countries, except;

1

Incompatible grid standards (voltage, frequency)

2

Established harmonized legal frameworks

3

Complex permitting and approval process

4

Long Project Timelines

8

Multiple Choice

Which of the following countries is involved in the LTMS Phase 1 power trade?

1

Brunei

2

Indonesia

3

Laos

4

Myanmar

9

Multiple Choice

Below are the capabilities of the grid-following BESS, except:

1

Black start

2

Fast response

3

Inertia and black start

4

Fast response and secondary frequency regulation

10

Multiple Select

Which of the following countries already have BESS in their power systems?

1

Malaysia

2

Philippines

3

Brunei

4

Singapore

In LTM-PIP and LTMS-PIP, what does "PIP" actually stand for?

1

Power in Progress

2

Power Implementation Project

3

Power Integration Project

4

Please Import Power

Show answer

Auto Play

Slide 1 / 10

MULTIPLE CHOICE