Sanitaryware level 2 part 2

Sanitaryware level 2 part 2

Professional Development

23 Qs

quiz-placeholder

Similar activities

2nd Quiz - SC Planning ATP Bootcamp

2nd Quiz - SC Planning ATP Bootcamp

Professional Development

21 Qs

KDP 2nd Exam

KDP 2nd Exam

Professional Development

20 Qs

NCCER Power Tools Quiz

NCCER Power Tools Quiz

Professional Development

20 Qs

Phase 2 Exam prep 1

Phase 2 Exam prep 1

Professional Development

20 Qs

Phase 2 Exam prep 2

Phase 2 Exam prep 2

Professional Development

20 Qs

Hazardous material and waste handling procedures

Hazardous material and waste handling procedures

KG - Professional Development

18 Qs

Family development 2

Family development 2

Professional Development

18 Qs

2 EXTRA (PARAGRAPH COMPREHENSION)

2 EXTRA (PARAGRAPH COMPREHENSION)

Professional Development

20 Qs

Sanitaryware level 2 part 2

Sanitaryware level 2 part 2

Assessment

Quiz

Professional Development

Professional Development

Medium

Used 52+ times

FREE Resource

23 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

A new automatic water flow cut off device has been correctly installed to an automatic flushing cistern but is not performing to specification. The appropriate action the plumber should take is to

advise the customer to return the item

strip the item down and attempt to repair it

get the item replaced under warranty

get the manufacturer to visit site and replace it.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The main purpose of a dual flush WC cistern is to

increase the volume of water to flush the pan

allow the cistern to be connected to a siphonic pan

prevent the possibility of the cistern overflowing.

significantly improve water conservation

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

A partially blocked outlet from a WC would cause

the siphon to malfunction

the WC cistern to overflow

the bath waste pipe to be blocked

failure of the pan to clear its contents completely.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

A pop-up waste fitted to a wash basin fails to retain the water when in the closed position. To rectify the problem a plumber should first

adjust the plug lift at the control port seal connection

Increase the plug lift by rotating the adjuster anti-clock wise

reduce the plug lift by rotating the adjuster clock wise

adjust the shackle so that it is closer to the waste fitting.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following jointing materials is suitable for making a plastic basin waste into a vitreous china wash basin?

Linseed oil putty

Jointing compound

Silicone sealant

Hemp.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the recommended flushing volumes of a dual flush wc cistern

6 and 5 litres

6 and 4 litres

8 and 4 litres

9 and 4.5 litres

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The cold water supply to a macerator WC should be isolated by a

Service valve

Gate valve

Supply stop valve

Single check valve

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?