1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following building components keeps opposite walls from spreading apart?
Trimmer studs
Rafters
Ceiling joists
Purlins
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To transfer roof loads to the foundation, ceiling joists are usually installed _____.
on a doubled top plate
between pairs of wall studs
directly over wall studs
with metal anchor plates
Tags
NGSS.MS-PS2-4
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When ceiling joists must be overlapped above a loadbearing partition, the overlap must be at least _____.
3"
6"
12"
18"
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A shed dormer is typically used on a house built in the _____.
Federal style
duplex style
Cape Cod style
ranch style
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A board nailed to the tails of the rafters to provide a nailing surface for the fascia is the _____.
purlin
barge board
false fascia
lookout
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The type of cut that is made to a rafter so it will rest squarely on the top plate is the _____.
notch
bird's mouth
sill cut
joist cut
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When laying out rafters, the distance between the last two may be less than 24", but not more than _____.
16"
18"
22"
24"
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?