Ag Mech I- 4.04: Framing walls, floor and roofs
Authored by Larry Edwards
Life Skills
9th - 12th Grade
Used 93+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
25 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When Sheri is framing a building, sills are installed
anytime
first
last
sixth
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the horizontal parts of a building's framing to which the studs are attached?
foundations
plates
ridges
trusses
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Trimmer studs for doors are installed
at the bottom
at the top
on each side
on one side
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If Jonathan goes to the building supply store and asks for hurricane ties, what is he purchasing?
ledger strips
metal framing anchors
roofing nails
sheetrock screws
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If one end of a stud is nailed to the sole plate, where should the other end be nailed?
ceiling joist
floor joist
foundation
top plate
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When a builder is using platform framing, the subfloor is nailed to the:
girder
joists
sill
top plates
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Since Stan is using platform framing, he should attach the rafters to the:
header
let-in brace
sole plate
top plate
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?