Set out Masonry Structures

Set out Masonry Structures

12th Grade

15 Qs

quiz-placeholder

Similar activities

Ch. 8 & 11 Key Terms

Ch. 8 & 11 Key Terms

9th - 12th Grade

11 Qs

Perbaikan Nilai UTS Mapel DKBUT

Perbaikan Nilai UTS Mapel DKBUT

10th - 12th Grade

15 Qs

Technology in Fashion

Technology in Fashion

KG - 12th Grade

15 Qs

M2: Site Layout/Surveying Tools Identification 27401

M2: Site Layout/Surveying Tools Identification 27401

9th - 12th Grade

15 Qs

Robotik Club

Robotik Club

7th - 12th Grade

10 Qs

TV Production

TV Production

9th - 12th Grade

10 Qs

Alora | Ons Belang

Alora | Ons Belang

KG - University

20 Qs

Canon XA11/15 Names of Parts Quiz

Canon XA11/15 Names of Parts Quiz

9th - 12th Grade

20 Qs

Set out Masonry Structures

Set out Masonry Structures

Assessment

Quiz

Other

12th Grade

Hard

Created by

Phil Hodgkinson

Used 31+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which plan is used to represent a vertical plane cut through a building?

Cross section

Isometric projection

General location

Assembly detail

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a datum peg?

To establish the building line

To set out brickwork

A fixed levelling point

To measure a building line

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When setting out a corbel from a detailed drawing, what is the MOST common scale used?

1:5

1:50

1:500

1:5000

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of working drawing gives general information about the surrounding area?

Site plan

Detailed plan

Assembly plan

Block plan

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which check would ensure a spirit level is accurate?

Check on an uneven surface

Check level by placing on current brickwork

By placing on top of another level

By rotating the level 180 degrees

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During adverse weather conditions, what should be put over brickwork to protect it?

Damp proof course

Hessian sheets

Spot boards

Damp proof membrane

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following hazards is MOST likely to occur during site clearance?

Unearthing of buried objects such as pipes or cables

Discovery of materials placed in the wrong position

Large machinery bogged down in poor weather conditions

Drains collapse under pressure of weight of the ground

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Other