Set out Masonry Structures

Set out Masonry Structures

12th Grade

15 Qs

quiz-placeholder

Similar activities

CFC Promotion Quiz

CFC Promotion Quiz

5th - 12th Grade

15 Qs

Plastic

Plastic

4th - 12th Grade

15 Qs

QUIZ ON INDEPENDANCEDAY

QUIZ ON INDEPENDANCEDAY

KG - University

15 Qs

Anong kwentong Raikan mo?

Anong kwentong Raikan mo?

KG - Professional Development

16 Qs

QUESTIONS ABOUT ROMANIA

QUESTIONS ABOUT ROMANIA

6th - 12th Grade

10 Qs

Legal System Roles

Legal System Roles

12th Grade

10 Qs

Guess the blackpink song lyrics

Guess the blackpink song lyrics

4th Grade - Professional Development

10 Qs

Undertale

Undertale

1st - 12th Grade

10 Qs

Set out Masonry Structures

Set out Masonry Structures

Assessment

Quiz

Other

12th Grade

Practice Problem

Hard

Created by

Phil Hodgkinson

Used 31+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which plan is used to represent a vertical plane cut through a building?

Cross section

Isometric projection

General location

Assembly detail

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a datum peg?

To establish the building line

To set out brickwork

A fixed levelling point

To measure a building line

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When setting out a corbel from a detailed drawing, what is the MOST common scale used?

1:5

1:50

1:500

1:5000

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of working drawing gives general information about the surrounding area?

Site plan

Detailed plan

Assembly plan

Block plan

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which check would ensure a spirit level is accurate?

Check on an uneven surface

Check level by placing on current brickwork

By placing on top of another level

By rotating the level 180 degrees

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During adverse weather conditions, what should be put over brickwork to protect it?

Damp proof course

Hessian sheets

Spot boards

Damp proof membrane

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following hazards is MOST likely to occur during site clearance?

Unearthing of buried objects such as pipes or cables

Discovery of materials placed in the wrong position

Large machinery bogged down in poor weather conditions

Drains collapse under pressure of weight of the ground

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?