Chapter 5: Plan Review

Chapter 5: Plan Review

9th Grade - University

25 Qs

quiz-placeholder

Similar activities

Cougar Cafe Trivia 8.27.2021

Cougar Cafe Trivia 8.27.2021

9th - 12th Grade

20 Qs

GEN ANA 1 LAB ACTIVITY 2024

GEN ANA 1 LAB ACTIVITY 2024

University - Professional Development

20 Qs

Research methodology

Research methodology

University

20 Qs

Group B Back and Spine Quiz

Group B Back and Spine Quiz

University

20 Qs

CH. 2 Econ

CH. 2 Econ

10th - 12th Grade

20 Qs

Electronics Resistor

Electronics Resistor

9th - 12th Grade

22 Qs

Permit Practice Test Part 2

Permit Practice Test Part 2

12th Grade

20 Qs

SMAMX - PRONOUN 2

SMAMX - PRONOUN 2

10th Grade

20 Qs

Chapter 5: Plan Review

Chapter 5: Plan Review

Assessment

Quiz

Other

9th Grade - University

Practice Problem

Hard

Created by

Michael McGinnis

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

__________ compare a structure to approved plans and the code.

Plan reviewers

Inspectors

Legislators

Insurance adjusters

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The primary purpose of the plan review process is to:

verify that a proposed structure is code compliant before work begins.

notify the public of the plan.

vote on the plan.

provide an additional level of safety.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A __________ is a plan for proposed development; it is submitted to the jurisdiction and includes location of structures, occupancy and construction type, proposed roadway and parking facilities, and available fire flow.

fire command memorandum

fire protection system plan

site plan

building plan

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The site plan is normally the __________ plan submitted for review.

first

second

final

only

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

All of the following are determined during the site plan approval process EXCEPT:

the location of the structure on the property.

the building height and area.

the road configuration.

the means of egress.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You are a fire department site plan reviewer looking over the plan for a new hospital. You have several concerns, including gates with a clearance 1 foot under the minimum blocking access to the shipping entrance. There are also fire hydrant supply lines that do not meet the 8-inch minimum. In order to address the problems in the most cost-effective and agreeable way, you should:

alert the developer before the site plan has been finalized.

alert the developer after the site plan has been finalized.

wait to see if the violations are spotted by the building official.

avoid communicating with the developer.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A __________ is a system of piping, valves, hose outlets, and allied equipment installed in a building to distribute fire protection water.

fire department connection

sprinkler

fire command center

standpipe

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?