Saubhagya Rbl-08-04-20

Saubhagya Rbl-08-04-20

KG - Professional Development

8 Qs

quiz-placeholder

Similar activities

ส้มนำเข้าจากประเทศออสเตรเลีย

ส้มนำเข้าจากประเทศออสเตรเลีย

3rd Grade

10 Qs

Training Digital Marketing Dasar

Training Digital Marketing Dasar

Professional Development

10 Qs

Field service-CRM

Field service-CRM

Professional Development

11 Qs

Customer Requests

Customer Requests

1st Grade

10 Qs

Monitoring Tab Review

Monitoring Tab Review

Professional Development

10 Qs

Electrical components identification

Electrical components identification

12th Grade - University

12 Qs

Principes PARC

Principes PARC

Professional Development

10 Qs

MFS backend

MFS backend

Professional Development

10 Qs

Saubhagya Rbl-08-04-20

Saubhagya Rbl-08-04-20

Assessment

Quiz

Professional Development

KG - Professional Development

Hard

Created by

Immanuel Raja

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

SIR Means

Site Immediate Report

Site Integrity Report

Site Investigation Report

Site Individual Report

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

During Pole Design Span calculation for Line Structure as per which Standard

IS:5613

IS:9683

IS:4158

IS:802

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

RCC Foundation for Poles is Used in

Angular Location

Cut Points

Both A & B

None of the above

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fire Wall is Not required If space between the Power Transformer above 6mtr??

False

True

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In below options Which Material is not Coming under Construction Material

Cement

Aggregates

JCB

Finishing Materials

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Its a Correct Procedure- Wall Conduits Should be laid before plastering the CRB?

True

False

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

In Case of Pure Capacitive Load,Voltage & Current Relation

Voltage and Current in same Phase

Voltage Lead with Current by 90degree

Voltage Lag with Current by 90degree

Voltage and Current are differential Phase

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?