Strategies for air sealing

Strategies for air sealing

10th - 12th Grade

10 Qs

quiz-placeholder

Similar activities

Ice Ice Baby Quiz

Ice Ice Baby Quiz

9th - 12th Grade

12 Qs

Desain Komunikasi Visual 3-

Desain Komunikasi Visual 3-

KG - University

10 Qs

ICT S212 Prelim Review

ICT S212 Prelim Review

12th Grade

13 Qs

funny quiz

funny quiz

KG - University

10 Qs

MILITARY ADMINISTRATION OF SHIVAJI

MILITARY ADMINISTRATION OF SHIVAJI

7th - 11th Grade

10 Qs

Is it OK at work?

Is it OK at work?

9th - 12th Grade

15 Qs

Tugas 1

Tugas 1

11th Grade

15 Qs

Goodbye, Butterflies!

Goodbye, Butterflies!

5th - 12th Grade

15 Qs

Strategies for air sealing

Strategies for air sealing

Assessment

Quiz

Life Skills

10th - 12th Grade

Hard

Created by

David Reed

Used 2+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Air sealing at the top and bottom of the building is the first priority because of

Air sealing at the top and bottom of the building is the first priority because of

the stack effect

the windwash effect

the need to conserve energy

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Air sealing work should be guided by the use of a:

blower door

infrared camera

bright light

box fan

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A bypass is a:

small gap between two framing members

an air pathway between two or more areas located inside the envelope

door that swings in both directions

result of the stack effect

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Walls that are enclosed on both sides and void of insulation can be air sealed:

without the use of a blower door

by applying at least a 10 mil coat of latex paint

using the dense pack method

all of the above

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Wind moving through insulation causes:

increased insulation effectiveness

windwash

condensation between the insulation and the vapor retarder

lower summer costs

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When sealing around a chimney or flue pipe, a _____________ must be installed to maintain a minimum 1” clearance between the insulation and the chimney.

high temp silicone sealant

insulation baffle

flue liner

insulation dam

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Band joists can be insulated and air sealed in one step using __________________.

caulk and mastic

sheet foam

a vapor retarder

two-part spray foam

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?