BTEC DIT : 2: Project Planning Methods: Retrieval Practice 1

BTEC DIT : 2: Project Planning Methods: Retrieval Practice 1

10th - 11th Grade

8 Qs

quiz-placeholder

Similar activities

BTEC Level 3 Nat Ext Dip in Computing - Unit 2.1 Hardware and Software

BTEC Level 3 Nat Ext Dip in Computing - Unit 2.1 Hardware and Software

11th - 12th Grade

10 Qs

Peer-to-peer & Client-server

Peer-to-peer & Client-server

11th Grade

10 Qs

pictoblox_lvl_1

pictoblox_lvl_1

2nd Grade - University

10 Qs

TLE 10 quiz 2021

TLE 10 quiz 2021

10th Grade

10 Qs

Program B: Level 2

Program B: Level 2

9th - 12th Grade

10 Qs

conditional constructs in Java

conditional constructs in Java

10th Grade

10 Qs

Grade 11 Term 4 Practice 2

Grade 11 Term 4 Practice 2

11th Grade

10 Qs

Logos - Digital Images

Logos - Digital Images

2nd - 10th Grade

10 Qs

BTEC DIT : 2: Project Planning Methods: Retrieval Practice 1

BTEC DIT : 2: Project Planning Methods: Retrieval Practice 1

Assessment

Quiz

Computers

10th - 11th Grade

Practice Problem

Hard

Created by

R Johnson

Used 15+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

8 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Name Two Project Planning Methodologies

Mindmaps

Waterfall

Flowcharts

Agile

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why do we need to use a methodology to help us with our project planning?

We need a dependable structure to help us achieve the project goals

Makes it easier

Breaks things down

Too hard to do things without

3.

FILL IN THE BLANK QUESTION

2 mins • 1 pt

Fill in the blank: Once a stage in the ............... model is complete we can't return to it.

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which of these are two key features of the Waterfall model?

Simple to follow

Easy steps

Distinct Stages

One after the other

5.

FILL IN THE BLANK QUESTION

2 mins • 1 pt

The waterfall model has some disadvantages. one of those it's ..................makes it impractical for many projects. (steps // flexibility // inflexibility)

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Two stages of the waterfall model are?

Design

check it

Analysis

Make it

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

The Agile model is an example of an .................. process (easier // iterative// repetitive

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?