SCOPE & QUALITY

SCOPE & QUALITY

Professional Development

20 Qs

quiz-placeholder

Similar activities

PMP Assessment

PMP Assessment

Professional Development

20 Qs

Project Management Process and Details

Project Management Process and Details

Professional Development

20 Qs

Chapter 5 - Scope Management

Chapter 5 - Scope Management

University - Professional Development

20 Qs

Scope Management Plan

Scope Management Plan

Professional Development

15 Qs

Project Integration Management

Project Integration Management

Professional Development

15 Qs

Project Management

Project Management

Professional Development

15 Qs

PMP Questions 6th Edition Quiz 1

PMP Questions 6th Edition Quiz 1

Professional Development

20 Qs

Project management Cycle

Project management Cycle

Professional Development

20 Qs

SCOPE & QUALITY

SCOPE & QUALITY

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Achmad Fuad

Used 12+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An approved version of a scope statement, WBS and its associated WBS dictionary, that can be changed using formal change control procedures and is used as a basis for comparison to actual result is called
Scope management plan
Scope control
Scope baseline
Scope verification

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A technique to breakdown the scope of work into smaller and more manageable work is called
Activity definition
Brainstorming
Decomposition
Rolling Wave Planning

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A hierarchical structured total scope of work to be carried out in a project is called
Schedule baseline
Work breakdown structure
Work package
Work variance

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The description of the project scope, major deliverables, assumptions and constraints in a project is called
Work breakdown structure
Work package
Scope management
Project scope statement

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A process of formalizing acceptance of the completed project deliverables is called
Validate scope
Control scope
Quality assurance
Acceptance criteria

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Activities such as measuring, examining and validating to determine whether work and deliverables meet requirements and product acceptance criteria is called
Inspection
Quality assurance
Quality control
Acceptance criteria

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

________________ is the lowest level of Work Breakdown Structure
Planning package
Work package
Project scope statement
WBS ID

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?