Search Header Logo

STAAR 6TH REVIEW MATH

Authored by Moon Drunken

Professional Development, Specialty, Other

6th Grade - Professional Development

Used 14+ times

STAAR 6TH REVIEW MATH
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which list shows the temperatures in order from coldest to warmest in degrees Fahrenheit?

-10°F 8°F -5°F 0°F

-5°F -10°F 0°F 8°F

-10°F -5°F 0°F 8°F

0°F -5°F 8°F -10°F

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

A coordinate grid is shown below. Which ordered pair describes a point that is located 4 units to the left of the origin and 2 units below the x-axis?

(4, 2)

(- 4, -2)

(-4, 2)

(4, -2)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A housepainter mixed 5 gal of blue paint with every 9 gal of yellow paint in order to make a green paint. Which ratio of gallons of blue paint to gallons of yellow paint will make the same shade of green paint?

30 : 54

6 : 10

10 : 45

27 : 15

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The students in a class were each asked to name their favorite meal of the day. The results are shown in this percentage bar graph. Which table could be represented by the percentage bar graph?

Media Image

b- 9 l- 3 s-18

B- 4 L-4 S-12

Media Image

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What value of x makes this equation true? -90 = -100 + x

-10

10

-190

190

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A team of workers took 167.3 hours to complete a task. A smaller team of workers will complete the same task, but it will take them 1.25 times as long as it took the first team. Based on this information, which statement is true?

The task will take the smaller team of workers 168.55 hours to complete, because 167.3 + 1.25 = 168.55.

The task will take the smaller team of workers 179.8 hours to complete, because 167.3 + 1.25 = 179.8.

The task will take the smaller team of workers 198.825 hours to complete, because 167.3 × 1.25 = 198.825.

The task will take the smaller team of workers 209.125 hours to complete, because 167.3 × 1.25 = 209.125.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?