1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which reset case If only one unit GT trip?

Prolong Shutdown

Pipeline depressurization

Flexible hose deppresurization

Our annual bonus will be decreased.

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

In the reset after pipeline depressurization case, how much mmscfd FSRU will initially send the gas to ORF after opening the GOP SDV?

50

120

40

85

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What operator should do and ensure before opening SSV in the first train in any case?

SSV bypass is open to fill the downstream line

Downstream isolation valve Pressure letdown skid in close condition

Ensure the setpoint of PSLL < 20 Barg in the downstream is achieved

Ensure that we bring the correct tools to open the SSV

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

In the flexible hose depressurization reset case, All the pipeline (GOP-ORF) is depressurized.

True

False

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

As long as the water temperature in the water bath is >50 deg.C, we can use cold gas directly from FSRU for the IFWBH burner.

False

True

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

How many reset conditions that listed on this WI?

5

2

3

4

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?