T Level BSE plumbing systems

T Level BSE plumbing systems

University - Professional Development

15 Qs

quiz-placeholder

Similar activities

MANAJEMEN KEUANGAN II

MANAJEMEN KEUANGAN II

University

20 Qs

Training Internal Audit ISO 9001:2015

Training Internal Audit ISO 9001:2015

Professional Development

10 Qs

Design Basics of Substation  engineering

Design Basics of Substation engineering

Professional Development

10 Qs

Atoha lesson 7

Atoha lesson 7

Professional Development

12 Qs

Stress Management

Stress Management

Professional Development

10 Qs

Manajemen Resiko

Manajemen Resiko

University - Professional Development

10 Qs

Mesin Perkakas CNC 3

Mesin Perkakas CNC 3

Professional Development

10 Qs

redemption quiz in anaphy

redemption quiz in anaphy

University

19 Qs

T Level BSE plumbing systems

T Level BSE plumbing systems

Assessment

Quiz

Professional Development

University - Professional Development

Medium

Created by

Nigel Baker

Used 67+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum depth a water main service pipe should be laid at?

750mm

1,850mm

1,350mm

1,750mm

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following water

pipes connects the local main to the water undertaker’s stop valve?

The distribution pipe

The feed pipe

The communication pipe

The service pipe

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the minimum depth a water main service should be laid

730mm

750 inches

750m

750mm

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fluid category 1 represents:

A serious health risk

A significant health risk

A slight health risk

No health risk

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

A rigid pipework hot water system has a working pressure of 4bar. At what pressure should the pipework be tested at for soundness

1bar for 60 minutes

6bar for 1 hour

4bar for 30 minutes then 6bar for 15 minutes

1½ times the working pressure for 15 minutes

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A cold water storage cistern base

must be supported:

Over the whole of its base

Over at least three bearers

By using chipboard

Over the majority of its base

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

This picture shows a?

Primary ventilated stack

Secondary ventilated stack

Soil pipe

Drain pipe

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?