PROFESSIONAL PRACTICE 03

PROFESSIONAL PRACTICE 03

University

12 Qs

quiz-placeholder

Similar activities

Global Mobility Mini-Game Sunday Funday

Global Mobility Mini-Game Sunday Funday

University

10 Qs

Econ Macro 24 - 24.1

Econ Macro 24 - 24.1

University

10 Qs

Intro To CJ Chapter 1

Intro To CJ Chapter 1

12th Grade - University

10 Qs

communication engineering online activity

communication engineering online activity

University

11 Qs

football of world

football of world

1st Grade - University

13 Qs

Anime 99

Anime 99

9th Grade - Professional Development

13 Qs

QUIZ TPHTP 5 - Pengolahan Teh Hitam

QUIZ TPHTP 5 - Pengolahan Teh Hitam

University

10 Qs

K-POP #ICTA-PRISKA

K-POP #ICTA-PRISKA

1st Grade - University

10 Qs

PROFESSIONAL PRACTICE 03

PROFESSIONAL PRACTICE 03

Assessment

Quiz

Other

University

Medium

Created by

Aryelle Sison

Used 151+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What part of the Architect’s services is site selection and analysis?

Contract documents

Schematic design

Design development

Pre-design

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the role of the project Manager during the Pre-Construction phase of the project?

Recommends early purchase of equipment/materials requiring a long lead for procurement and delivery for expediency

Observes work in progress to assure compliance with drawings/specification

Manages general coordination and scheduling of work

Revise and refines estimates as construction proceeds

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In a typical owner-architect agreement, which of the following is NOT part of architect’s professional fees?

Income taxes on professional fees

Five sets of plans and contract documents

Surveys and soil exploration

Mechanical/electrical engineering

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following does NOT constitute the post-construction services of the architect?

Real property evaluation

Post-construction evaluation

Building/ground administration

Building/equipment maintenance

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the minimum basic fee for parking structures with a project construction cost of P40M?

P 2.4 M

P 2.8M

P 3.2 M

P 3.6M

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What method of compensation is most suitable for compensating the Architect's services for the pre-design phase?

multiple of direct personnel expense

lump sum or fixed fee

per-diem plus reimbursible expenses

professional fee plus expenses

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which is a prohibition in the practice of Architecture?

a person claiming architectural work without using the title "Architect"

a person enticing a registered architect to first execute a written contract

solicitation of architectural work by registered architects

a government architect signing for architectural plans prepared under his supervision

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?