
PROFESSIONAL PRACTICE 03
Authored by Aryelle Sison
Other
University
Used 151+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
12 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What part of the Architect’s services is site selection and analysis?
Contract documents
Schematic design
Design development
Pre-design
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What is the role of the project Manager during the Pre-Construction phase of the project?
Recommends early purchase of equipment/materials requiring a long lead for procurement and delivery for expediency
Observes work in progress to assure compliance with drawings/specification
Manages general coordination and scheduling of work
Revise and refines estimates as construction proceeds
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
In a typical owner-architect agreement, which of the following is NOT part of architect’s professional fees?
Income taxes on professional fees
Five sets of plans and contract documents
Surveys and soil exploration
Mechanical/electrical engineering
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following does NOT constitute the post-construction services of the architect?
Real property evaluation
Post-construction evaluation
Building/ground administration
Building/equipment maintenance
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What is the minimum basic fee for parking structures with a project construction cost of P40M?
P 2.4 M
P 2.8M
P 3.2 M
P 3.6M
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What method of compensation is most suitable for compensating the Architect's services for the pre-design phase?
multiple of direct personnel expense
lump sum or fixed fee
per-diem plus reimbursible expenses
professional fee plus expenses
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which is a prohibition in the practice of Architecture?
a person claiming architectural work without using the title "Architect"
a person enticing a registered architect to first execute a written contract
solicitation of architectural work by registered architects
a government architect signing for architectural plans prepared under his supervision
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
10 questions
7BUSS007C - 1
Quiz
•
University
11 questions
Drug For Anti-Hypertension
Quiz
•
University
10 questions
indirect taxes
Quiz
•
University
15 questions
PLANE TABLE SURVEYING
Quiz
•
University
10 questions
Linguistics (I): Course Introduction
Quiz
•
University
17 questions
Managing Current Records
Quiz
•
University
10 questions
Czech Republic Quiz
Quiz
•
University
11 questions
Ant science
Quiz
•
5th Grade - University
Popular Resources on Wayground
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
54 questions
Analyzing Line Graphs & Tables
Quiz
•
4th Grade
22 questions
fractions
Quiz
•
3rd Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade
15 questions
Equivalent Fractions
Quiz
•
4th Grade
Discover more resources for Other
7 questions
How James Brown Invented Funk
Interactive video
•
10th Grade - University
5 questions
Helping Build the Internet: Valerie Thomas | Great Minds
Interactive video
•
11th Grade - University
12 questions
IREAD Week 4 - Review
Quiz
•
3rd Grade - University
23 questions
Subject Verb Agreement
Quiz
•
9th Grade - University
7 questions
Renewable and Nonrenewable Resources
Interactive video
•
4th Grade - University
19 questions
Review2-TEACHER
Quiz
•
University
15 questions
Pre2_STUDENT
Quiz
•
University
20 questions
Ch. 7 Quadrilateral Quiz Review
Quiz
•
KG - University