MFW System

MFW System

8 Qs

quiz-placeholder

Similar activities

Carbon Neutrality

Carbon Neutrality

Professional Development

8 Qs

Primera PC

Primera PC

KG - 10th Grade

6 Qs

Time Speed and Distance

Time Speed and Distance

University

10 Qs

Power Link Budget

Power Link Budget

4th Grade

5 Qs

Booth 2 - Group Tax Open Day (Quiz 2)

Booth 2 - Group Tax Open Day (Quiz 2)

Professional Development

8 Qs

PD Hamed LQD

PD Hamed LQD

Professional Development

6 Qs

Load Sensing & Pressure Compensated

Load Sensing & Pressure Compensated

Professional Development

10 Qs

FTTH Specification

FTTH Specification

2nd Grade

5 Qs

MFW System

MFW System

Assessment

Quiz

Professional Development

Medium

Created by

Mark Everett

Used 1+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 5 pts

MFP suction sources include which of the following?

EFW

Heater Drain Pumps

Aux. Feedwater

Condensate System

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Normal flow to each steam generator is approx.?

5000 gpm

10,000 gpm

16,000 gpm

32,000 gpm

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Which of the following statements regarding MFP discharge pressure is true?

At 1275 psig the MFP will trip.

The MFP will trip at 1250 psig if the high discharge pressure alarm is in.

The MFP will trip if 1300 psig is sensed downstream of 2E-1A/B AND 1250 psig is sensed at the outlet of the MFP.

The recirc valves will open when discharge pressure exceeds 1200 psig.

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The standby condensate pump will auto start at what MFP suction pressure?

325 psig

450 psig

425 psig

400 psig

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The MFP will trip at what MFP suction pressure?

450 psig

425 psig

400 psig

325 psig

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Normal heater drain pump flow is approx.?

4000 gpm

5000 gpm

6000 gpm

2000 gpm

7.

MULTIPLE SELECT QUESTION

45 sec • 5 pts

MFWIV (Block valves) are located where?

UNPPR

USPPR

Turbine Bldg 386'

Outside Chemistry

Turbine Bldg 335'

Near Heater Drain Pumps

8.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Upon actuation the block valves are required to close within:

Upstream: 13.5 sec.

Downstream: 20 sec.

Upstream: 15 sec.

Downstream 8 sec.

Upstream: 20.2 sec.

Downstream 10.5 sec.

Upstream: 10 sec.

Downstream: 30 sec.