1.

OPEN ENDED QUESTION

5 mins • 2 pts

1. Identify in what circumstances a JSEA may be required?

Evaluate responses using AI:

OFF

Answer explanation

A Job Safety Environment Analysis (JSEA) is required where there is no work instruction, or the task is not completed as per the manufacturer specifications in the workshop.

2.

OPEN ENDED QUESTION

5 mins • 2 pts

2. Advise when an ATW is required?

Evaluate responses using AI:

OFF

Answer explanation

An Authority to Work (ATW) is required:

Where there is no Work Instruction

When required by the Plant Owner

When the work is undertaken by contractors working on site (excludes where they are directly supervised by an authorised employee)

Working at heights

3.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

3. Respond to this statement. "Isolation of mobile equipment and placement of maintenance personnel's red personal lock, is mandatory prior to any maintenance work commencing, failure to comply can lead to disciplinary action up to and including dismissal"

True

False

Answer explanation

Maintenance Personnel must isolate the equipment and attach their red personal lock prior to the commencement of any work. Failure to comply can lead to disciplinary action up to and including dismissal.

4.

OPEN ENDED QUESTION

5 mins • 2 pts

4. What must occur if the battery isolator on equipment cannot be locked?

Evaluate responses using AI:

OFF

Answer explanation

Where equipment cannot be isolated the task shall be risk assessed.

Where the battery isolator is not lockable refer to Working on Live Equipment procedures.

5.

OPEN ENDED QUESTION

5 mins • 3 pts

5. Document the process if an isolator is required to be bridged to be able to move the equipment?

Evaluate responses using AI:

OFF

Answer explanation

Where a safety device attached to equipment is required to be bridged in order to move it, a JSEA must be completed prior to the task commencing.

This may only be authorised by a relevant Manager.

Once the equipment has been moved to a safe location, the bridge shall be removed and the faulty safety device physically removed. If on an operational site (not at workshop) the equipment shall then be barricaded.

6.

OPEN ENDED QUESTION

5 mins • 2 pts

6. Identify what type of barricade must be used, when working on live mobile equipment and how it is set up?

Evaluate responses using AI:

OFF

Answer explanation

The equipment shall be barricaded prior to working on the live machine:

Equipment shall be Danger Barricaded with an unbroken perimeter that fully encloses the equipment with sufficient Danger Flags that they are clearly visible from all approaches. A completed warning tag must be attached at a nominated entry and exit point which is visible to the tradesperson in the cabin.

7.

OPEN ENDED QUESTION

5 mins • 2 pts

7. Identify who can work on live mobile equipment for diagnostic, commissioning, inspection or calibration Work?

Evaluate responses using AI:

OFF

Answer explanation

Only qualified maintenance personnel who have been trained in this Procedure IP WS 01 may work on live equipment for diagnostic, commissioning, inspection or calibration work.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development