MA Ch-15 to 16

MA Ch-15 to 16

Professional Development

40 Qs

quiz-placeholder

Similar activities

AL3451_Machine Learning Assignement 2

AL3451_Machine Learning Assignement 2

Professional Development

40 Qs

Chân dung nhân sự - Performance Marketing

Chân dung nhân sự - Performance Marketing

Professional Development

40 Qs

computer concepts Test - Youth Skills

computer concepts Test - Youth Skills

Professional Development

38 Qs

Chapter 14: Civil process and liability

Chapter 14: Civil process and liability

Professional Development

41 Qs

Đề 15

Đề 15

Professional Development

40 Qs

MA -  Mock 2 (2023)

MA - Mock 2 (2023)

Professional Development

44 Qs

PRE-TEST ORIENTATION/RE-ORIENTATION WORKSHOP

PRE-TEST ORIENTATION/RE-ORIENTATION WORKSHOP

Professional Development

35 Qs

PENGETAHUAN 1 IASP 2020

PENGETAHUAN 1 IASP 2020

Professional Development

40 Qs

MA Ch-15 to 16

MA Ch-15 to 16

Assessment

Quiz

Other

Professional Development

Medium

Created by

PFC Education

Used 6+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What is an attainable standard?

A standard which includes no allowance for losses, waste and inefficiencies. It represents the level of performance which is attainable under perfect operating conditions

A standard which includes some allowance for losses, waste and inefficiencies. It represents the level of performance which is attainable under efficient operating conditions

A standard which is based on currently attainable operating conditions 

A standard which is kept unchanged, to show the trend in costs

2.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

A company is in the process of setting standard unit costs for next period. Product J uses two types of material, P and S. 7 kg of material P and 3 kg of material S are needed, at a standard price of $4 per kg and $9 per kg respectively.

Direct labour will cost $7 per hour and each unit of J requires 5 hours of labour

Production overheads are to be recovered at the rate of $6 per direct labour hour, and general overhead is to be absorbed at a rate of ten per cent of production cost.

What is the standard prime cost for one unit of product J?

$90

$80

$70

$60

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following statements is correct?

The operating standards set for production should be the most ideal possible

he operating standards set for production should be the minimal level

The operating standards set for production should be the attainable level

The operating standards set for production should be the maximum level

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A company manufactures a carbonated drink, which is sold in 1 litre bottles. During the bottling process there is a 20% loss of liquid input due to spillage and evaporation. What is the standard usage of liquid per bottle (to two decimal places)?

1.25 liters

1.23 liters

1.22 liters

1.21 liters

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following best describes management by exception?

Using management reports to highlight exceptionally good performance, so that favourable results can be built upon to improve future outcomes

Sending management reports only to those managers who are able to act on the information contained within the reports

Focusing management reports on areas which require attention and ignoring those which appear to be performing within acceptable limits

Focusing management reports on areas which are performing just outside acceptable limits

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Standard costing provides which of the following?

(i) Targets and measures of performance

(ii) Information for budgeting

(iii) Simplification of inventory control systems

(iv) Actual future costs

(i), (ii) and (iii) only

(ii), (iii) and (iv) only

(i), (iii) and (iv) only

(i), (ii) and (iv) only

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A unit of product L requires 9 active labour hours for completion. The performance standard for product L allows for ten per cent of total labour time to be idle, due to machine downtime. The standard wage rate is $9 per hour.

What is the standard labour cost per unit of product L?

$90.00

$80.00

$70.00

$60.00

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?