SQC Control chart

SQC Control chart

Professional Development

6 Qs

quiz-placeholder

Similar activities

Diatonic Modes

Diatonic Modes

9th Grade - Professional Development

8 Qs

PROF ED 72

PROF ED 72

Professional Development

7 Qs

INCOME TAX

INCOME TAX

University - Professional Development

10 Qs

Basic Accounting

Basic Accounting

Professional Development

10 Qs

COUNTERS IN PLC

COUNTERS IN PLC

Professional Development

10 Qs

JavaScript Fundamentals

JavaScript Fundamentals

9th Grade - Professional Development

10 Qs

Amtrak all aboard page

Amtrak all aboard page

Professional Development

7 Qs

The Future of Diamond

The Future of Diamond

Professional Development

10 Qs

SQC Control chart

SQC Control chart

Assessment

Quiz

Education

Professional Development

Hard

Created by

Cho Tan

Used 5+ times

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Media Image

What does a X bar & R control chart helps to monitor for a machining shop?

Shop floor size; Big or small

Price of component; High price or low price

Ongoing processes; such as the production capabilities of machines.

2.

MULTIPLE SELECT QUESTION

20 sec • 1 pt

Identify the application/(s) of Control Chart from the options given below. Select more than 1 answer.

Improve Productivity.

Defect prevention.

Avoid process adjustment.

Diagnostic information for quality-related analysis.

Information about process capability.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3 sample's dimension were recorded as follows:

1. 10.1 mm

2. 10.2 mm

3. 10.3 mm 

What is the Mean dimension and Range of dimension recorded?

Mean: 10.6 mm

Range: 0.1 mm

Mean: 10.2 mm

Range: 0.2 mm

Mean: 10.3 mm

Range: 0.3 mm

4.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

What are the value required for plotting R chart.

Select more than 1 answer.

Max. value minus Min. value of the sample data set & Average range value of all data set.

UCL & LCL of R chart

UCL & LCL of X bar chart

Mean value of data set & Average value of Mean data set.

5.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

What are the value required for plotting X bar chart?

Select more than 1 answer.

UCL & LCL X bar chart

Mean value of data set & Average value of Mean data set.

UCL & LCL of R chart

Max. value minus Min. value of the sample data set & Average range value of all data set.

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Describe what should be performed when data point/(s) is outside of UCL or LCL of control chart?

Amend the data point recorded to plot the control chart.

Review the control chart and call for an investigation on the data points that is out of UCL or LCL range