CMA 385 - Exam 2 Review - Chapters: 4-6

CMA 385 - Exam 2 Review - Chapters: 4-6

University

76 Qs

quiz-placeholder

Similar activities

CET Section III

CET Section III

University

75 Qs

Frumento

Frumento

12th Grade - University

79 Qs

UAB 1.5 HEALTH EDUCATION AND PATIENT SAFETY

UAB 1.5 HEALTH EDUCATION AND PATIENT SAFETY

University

75 Qs

PEDIATRIA MORTAL

PEDIATRIA MORTAL

University

75 Qs

ELECTRICAL MACHINE - 1

ELECTRICAL MACHINE - 1

University

80 Qs

Fiqh Munakahat- UAS

Fiqh Munakahat- UAS

University

80 Qs

Riset Operasional

Riset Operasional

University

75 Qs

ASTS Sarana Prasarana

ASTS Sarana Prasarana

12th Grade - University

75 Qs

CMA 385 - Exam 2 Review - Chapters: 4-6

CMA 385 - Exam 2 Review - Chapters: 4-6

Assessment

Quiz

Other

University

Medium

Created by

Jeremiah Arnett

Used 175+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

76 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The three basic contract categories are standard contracts, ___ contracts, and job-specific contracts.

federally regulated

AHJ-developed

construction bid

owner- or contractor-developed

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Making accurate ___ requires the services of a person knowledgeable about the times required for each phase of the work and each trade.

project schedules

progress reports

construction updates

milestone markers

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

In some instances, owners may require ___ or other operational documentation be provided at the conclusion of construction to allow for ongoing maintenance and repairs of the facility.

final site plans

comprehensive procedures

as-built drawings

detailed sketches

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

___ is the process of reviewing the final performance of building systems to ensure they meet owner and design requirements.

Commisioning

Project overview

Job-site analysis

Detail design review

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A(n) ___ is a temporary road installed by a general contractor to facilitate transportation of materials, equipment, and tradesworkers into and out of a job site.

construction thruway

means of approach

access road

entry path

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Information concerning ___ is included in section 01 56 26 of the specifications for a project.

barrier erection

temporary fencing

protective walkways

existing fencing

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The potential needs for weather protection and heating are determined by the ___ using the project schedule.

general contrator

owner

architect

project manager

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?