Chapter 15 ALTERNATE WATER SOURCES

Chapter 15 ALTERNATE WATER SOURCES

Professional Development

19 Qs

quiz-placeholder

Similar activities

NEP Quiz Chapter1 : ECCE - The foundation of learning

NEP Quiz Chapter1 : ECCE - The foundation of learning

KG - Professional Development

18 Qs

ROTY Level 2

ROTY Level 2

Professional Development

20 Qs

Topic 3. The communication process

Topic 3. The communication process

Professional Development

15 Qs

PRODUCT KOWLEDGE

PRODUCT KOWLEDGE

Professional Development

20 Qs

PART BOOK READING 1

PART BOOK READING 1

Professional Development

23 Qs

ทดสอบความรู้เกี่ยวกับ Quizizz

ทดสอบความรู้เกี่ยวกับ Quizizz

Professional Development

15 Qs

The Handmaid's Tale

The Handmaid's Tale

9th Grade - Professional Development

20 Qs

Associate Review

Associate Review

Professional Development

19 Qs

Chapter 15 ALTERNATE WATER SOURCES

Chapter 15 ALTERNATE WATER SOURCES

Assessment

Quiz

Education

Professional Development

Hard

Created by

Dale Wilcox

FREE Resource

19 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. The provisions of ______________ shall apply to the construction, alteration, and repair of alternate water source systems for non-potable applications.

Code Section 1501.1 Washington State Amendments

a. this chapter

b. the authority having jurisdiction

c. this chapter and the Washington State Department of health

d. the Washington State Department of health

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. Gray water installations exceeding a maximum discharge capacity of ______ gallons per day shall be designed by a registered design professional.

Code Section 1501.2

a. 150

b. 175

c. 200

d. 250

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. Each room containing on-site treated water equipment shall have a sign posted with _____ inch letters.

Code Section 1501.9.1

a. 1/4”

b. 1/2”

c. 3/4”

d. 1”

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. Cross-connection inspection and testing on both potable and reclaimed water systems shall be performed ____.

Code Section 1502.3

a. initially

b. annually

c. semi-annually

d. initially and annually

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5. Upon discovery of a cross connection, the potable water system shall be chlorinated with ____ parts per million.

Code Section 1502.3.3 (5)

a. 50

b. 75

c. 100

d. 110

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. Reclaimed water pipes shall be permitted to be run in the same trench as potable water pipes with a _____ inch minimum vertical and horizontal separation where both pipe materials are approved for use within a building.

Code Section 1502.4

a. 6

b. 12

c. 18

d. 24

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7. On-site treated non potable water piping sizing shall comply with ______.

Code Section 1502.6

a. table 610.3

b. table 702.1

c. Chapter 6

d. chapter 7

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?