2018 IPC CH 9A Study Quiz

2018 IPC CH 9A Study Quiz

Professional Development

25 Qs

quiz-placeholder

Similar activities

Do I Know You?

Do I Know You?

KG - Professional Development

20 Qs

Repaso FOL 3ª Evaluación

Repaso FOL 3ª Evaluación

Professional Development

20 Qs

TX Ch-5 to 8

TX Ch-5 to 8

Professional Development

20 Qs

Washing Machine Post CT Test

Washing Machine Post CT Test

Professional Development

20 Qs

Hành trang bước ra thế giới

Hành trang bước ra thế giới

Professional Development

20 Qs

FOOD SAFETY DAY

FOOD SAFETY DAY

Professional Development

20 Qs

Mystery Audit EEP Quiz

Mystery Audit EEP Quiz

Professional Development

20 Qs

SJAG Bible Quiz

SJAG Bible Quiz

KG - Professional Development

20 Qs

2018 IPC CH 9A Study Quiz

2018 IPC CH 9A Study Quiz

Assessment

Quiz

Other

Professional Development

Medium

Created by

Johnny Thulin

Used 10+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

01. The main purpose of venting is for __________.

a. exhaust of sewer gases
b. trap seal protection
c. decreasing flow rates
1.       d. increasing flow rates
Sec. 901.2

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

02. A vent piping system is necessary to prevent pressure differentials of more than __________ against the trap seal of any fixture.

a. 1 inch of water column
b. 1 foot of head
c. 1 PSI
2.       d. 0.433 PSI
Sec. 901.2

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

03. The vent system for a chemical waste system must __________.

a. connect to the sanitary vent system above the highest fixture
b. terminate through a wall to the outdoors
c. be independent of the sanitary vent system
3.       d. terminate in a stack-type air admittance valve
Sec. 901.3

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

04. Prefabricated lead flashings for vent pipe penetrations must have a sheet weight of not less than __________ pounds per square foot.

a. 3.5
b. 2.5
c. 1.25
4.       d. 0.75
Sec. 902.3

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

05. In a sanitary drainage system, what is the minimum number of vent pipes that are required to extend to the outdoors?

a. one
b. two
c. one for each air admittance valve
5.       d. one for each vent stack or stack vent
Sec. 904.1

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

06. A vent stack connection to the base of a stack is required to connect__________.

a. above the lowest horizontal branch
b. to the building drain
c. at or below the lowest horizontal branch
6.       d. a minimum of 10 pipe diameters away from the stack
Sec. 904.4

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

07. Where required to be protected against frost closure, the vent extension through the roof shall be not less than __________ inches in diameter beginning not less than __________ inches inside the thermal envelope.

a. 4, 12
b. 3, 12
c. 3, 18
7.       d. 4, 6
Sec. 903.2

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?