values engineering, cons est.

values engineering, cons est.

University

28 Qs

quiz-placeholder

Similar activities

1.03 Recognizing and Responding to Emergencies

1.03 Recognizing and Responding to Emergencies

KG - Professional Development

25 Qs

Heritage Stakeholder

Heritage Stakeholder

University

25 Qs

BABAK SEMIFINAL PACE AND PROPER - SMA

BABAK SEMIFINAL PACE AND PROPER - SMA

University

25 Qs

Malaysian Legal System

Malaysian Legal System

University

25 Qs

2017 POP CULTURE

2017 POP CULTURE

6th Grade - University

25 Qs

Gender and culture

Gender and culture

University

23 Qs

Bible Quiz (August 13, 2021)

Bible Quiz (August 13, 2021)

KG - Professional Development

23 Qs

Avengers.....Assemble

Avengers.....Assemble

1st Grade - University

23 Qs

values engineering, cons est.

values engineering, cons est.

Assessment

Quiz

Other

University

Practice Problem

Hard

Created by

e ew

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

28 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

1 min • 1 pt

It is the process of anticipating the expense of building a

physical structure. This step is essential, and one of the most crucial

in the construction process. Estimators need to be as accurate as

possible because profit margins (the livelihood of contractors) are

impacted if any estimated direct and indirect costs for the project are

off by even the slight amount.

2.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Cost Estimating Key Components

3.

FILL IN THE BLANK QUESTION

1 min • 1 pt

are costs and expenses that are accountable directly for a specific

activity in construction work.

4.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Some examples of ______ are: Materials,

Field workers (labor), and

Equipment

5.

FILL IN THE BLANK QUESTION

1 min • 1 pt

are expenses of items that are not allocated directly for specific

construction activities. These are called overhead costs.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which are not example of indirect costs

Quality control

Security costs

Legal fees & permit

Materials

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Types of Construction Estimate

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?