CE175x

CE175x

University

38 Qs

quiz-placeholder

Similar activities

INFO 232 / COMP 351 - CH 2

INFO 232 / COMP 351 - CH 2

University

40 Qs

Nagarjuna

Nagarjuna

University

41 Qs

TESTING MEASUREMENT AND EVALUATION Q1

TESTING MEASUREMENT AND EVALUATION Q1

University

40 Qs

CA MNT INBORN ERROR METABOLISM

CA MNT INBORN ERROR METABOLISM

University

35 Qs

WEBTOOLS LESSON 1

WEBTOOLS LESSON 1

University

41 Qs

RISK MANAGEMENT

RISK MANAGEMENT

12th Grade - University

42 Qs

AI Quiz for Class 10

AI Quiz for Class 10

10th Grade - University

35 Qs

UTS Statistik Materi Regresi 2024

UTS Statistik Materi Regresi 2024

University

41 Qs

CE175x

CE175x

Assessment

Quiz

Other

University

Easy

Created by

Cyrill Ricafort

Used 19+ times

FREE Resource

38 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A soil has a specific gravity of 2.68 and a void ratio of 0.73 if the degree of saturation is 92%. Compute the dry density of the soil in g/cc.

1.97

1.74

2.03

1.55

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In general, it is the densification of soil by removal of air, which requires mechanical energy.

Compaction

Consolidation

Compression

None of the above

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

It is the minimum distance required to stop a vehicle before it reaches a stationary object.

Decision Sight Distance

Stopping Sight Distance

Passing Sight Distance

Intersection Sight Distance

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

If super-elevation is not provided on a horizontal curve of a highway, then on which portion of the road, are pot holes likely to develop?

Center of road

Outer edge of road

Inner edge of road

Shoulder of road

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The maximum super elevation to be provided on a road curve is 1 in 15. If the rate of change of super elevation is specified as 1 in 120 and the road width is 10 m, then the minimum length of the transition curve on either will be:

180 m

80 m

130 m

30 m

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

They are flat horizontal panels that support the floor.

Beams

Columns

Slabs

Footings

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Locational clearance requirements in acquiring building permit are the following except:

Foundation plan

Site development plan

Location plan

Lot plan

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?