CE175x

CE175x

University

38 Qs

quiz-placeholder

Similar activities

Review - Quiz 1 and 2

Review - Quiz 1 and 2

University

43 Qs

Vexcode Midterm Test Review

Vexcode Midterm Test Review

7th Grade - University

37 Qs

UTS GANJIL IPAS X,XI 2024

UTS GANJIL IPAS X,XI 2024

10th Grade - University

35 Qs

Agroinformatika

Agroinformatika

University

37 Qs

DR. JONES VENTILATION

DR. JONES VENTILATION

University

39 Qs

ME 8561_DTS_UNIT-5_MCQ

ME 8561_DTS_UNIT-5_MCQ

University

40 Qs

RAD 147 Exam 2 (Primary and Secondary Exposure Factors)

RAD 147 Exam 2 (Primary and Secondary Exposure Factors)

University

35 Qs

PERSIAPAN US

PERSIAPAN US

KG - University

40 Qs

CE175x

CE175x

Assessment

Quiz

Other

University

Easy

Created by

Cyrill Ricafort

Used 19+ times

FREE Resource

38 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A soil has a specific gravity of 2.68 and a void ratio of 0.73 if the degree of saturation is 92%. Compute the dry density of the soil in g/cc.

1.97

1.74

2.03

1.55

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In general, it is the densification of soil by removal of air, which requires mechanical energy.

Compaction

Consolidation

Compression

None of the above

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

It is the minimum distance required to stop a vehicle before it reaches a stationary object.

Decision Sight Distance

Stopping Sight Distance

Passing Sight Distance

Intersection Sight Distance

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

If super-elevation is not provided on a horizontal curve of a highway, then on which portion of the road, are pot holes likely to develop?

Center of road

Outer edge of road

Inner edge of road

Shoulder of road

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The maximum super elevation to be provided on a road curve is 1 in 15. If the rate of change of super elevation is specified as 1 in 120 and the road width is 10 m, then the minimum length of the transition curve on either will be:

180 m

80 m

130 m

30 m

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

They are flat horizontal panels that support the floor.

Beams

Columns

Slabs

Footings

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Locational clearance requirements in acquiring building permit are the following except:

Foundation plan

Site development plan

Location plan

Lot plan

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?