SPT01

SPT01

Professional Development

93 Qs

quiz-placeholder

Similar activities

InFormal communication

InFormal communication

Professional Development

93 Qs

Adcc combo 15

Adcc combo 15

Professional Development

94 Qs

quiz

quiz

Professional Development

97 Qs

Milady Disorders and Diseases of the Skin Chapter P2

Milady Disorders and Diseases of the Skin Chapter P2

Professional Development

92 Qs

BMH 24

BMH 24

Professional Development

98 Qs

Soal Lomba Cerdas Cermat

Soal Lomba Cerdas Cermat

Professional Development

98 Qs

DISNEY

DISNEY

1st Grade - Professional Development

96 Qs

Final Exam Review

Final Exam Review

Professional Development

93 Qs

SPT01

SPT01

Assessment

Quiz

Other

Professional Development

Medium

Created by

Johnny Thulin

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

93 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Acid-resisting trap is installed underground, such trap shall be embedded in concrete extending _" beyond the trap.
2
3
4
6

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The maximum retention time for untreated gray water in a collection reservoir is __________ hours.
24
48
36
72

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Hose bibbs require protection from backflow by a(n) __________.
Air gap
Vacuum breaker
Reduced pressure principle backflow preventer
Double check valve

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

All horizontal drains shall have cleanouts located no more than __________ feet apart.
40
60
80
100

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Individual and branch vent pipes over 40 feet long require __________.
not less than 2 inches in diameter
one-half the diameter of the drain served
not less than 2 pipe sizes smaller than the largest drain served
pipe size greater than otherwise required

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

"Test reports required as evidence of code compliance shall be retained for __________.
180 days after completion of the project
the period required for retention of public records
90 days after completion of the project
120 days after occupancy of the building

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The maximum developed length of a 11/4-inch vent pipe for a 40 gpm sewage ejector pump is __________ feet.
unlimited
40
72
d. 160

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?