[Intensive Odoo 1 - 12/2022] W5 - Manufacturing 1

Authored by Novobi Tool

Professional Development

Professional Development

to review covered

Used 7+ times

 [Intensive Odoo 1 - 12/2022] W5 - Manufacturing 1
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

22 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which statements are correct about Bill of Materials?

We can set up 2 different BoMs for 1 product

A BoM can contain no component line

A component must be a storable or consumable product

We can select both Product Template and Variant of another one in a BoM

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which statements are correct about Bill of Materials?

We can set up By-products for a Kit product

A component could be a service product

The Work Center is required when adding a new Operation

The Reference must be unique

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

In a BoM, if "Flexible Consumption" is "blocked", what will happen if the user enters the consumed qty which is greater than what is defined?

Button "Validate" is hidden

Only admin is able to validate the MO

Odoo will raise an error when validating

Odoo will raise an error when that invalid number is entered

4.

FILL IN THE BLANKS QUESTION

1 min • 1 pt

A By-Product is a (a)   product that is created during production in addition to the main product of a BoM

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which work center will Odoo select when using the alternative work center feature?

The current work center assigned to this work order. If it is unavailable, get from its alternative work centers

The cheapest one

The one which will finish the task soonest

The one which has the most empty slots

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When will the forecasted quantity of component products be updated?

When the MO is created

When the MO is confirmed

When the MO is in progress

When the MO is ready to close

When the MO is marked as done

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

"Production" is a (an) _____ location. Its type is "_____", which consumes the components and produces finished products

internal / Transit Location

virtual / Production

physical / Production

internal / Internal Location

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?