Trial Test NACE 2 pt 2

Trial Test NACE 2 pt 2

Professional Development

50 Qs

quiz-placeholder

Similar activities

Cerdas Cermat Final

Cerdas Cermat Final

Professional Development

50 Qs

EPA Mock Test

EPA Mock Test

Professional Development

50 Qs

RA 9514 (Definition of terms)

RA 9514 (Definition of terms)

Professional Development

50 Qs

NAMO POSTAL ACADEMY        POSTAL MANUAL VOLUME 7

NAMO POSTAL ACADEMY POSTAL MANUAL VOLUME 7

Professional Development

50 Qs

PEDAGOGIK 2

PEDAGOGIK 2

Professional Development

50 Qs

TRY OUT EVALUASI MOOC_A3K3_PART 2

TRY OUT EVALUASI MOOC_A3K3_PART 2

Professional Development

50 Qs

BASIC HYDRAULIC CYLINDERS

BASIC HYDRAULIC CYLINDERS

Professional Development

50 Qs

Trial Test NACE 2 pt 2

Trial Test NACE 2 pt 2

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Rasy Ally

Used 13+ times

FREE Resource

50 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

20 sec • 1 pt

You are working as an inspector in a galvanizing plant for the first time.

What are some of the hazards you need to be aware of :

Risk of chemical exposure

Risk of skin

Risk of acid or caustic splashes

All of the above

None of the above

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

An Inspection and Test Plan is required when :

It is always required

When the Owner specifies one

When the Inspector requests one

When the Coating Applicator requests one

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Coating Surveys are legally required :

On commercial marine vessels and offshore platforms

On high pressure gas lines and fireproofed structures

On water tanks and potable water pipelines

On food and beverage vessels and can linings

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The cost of qualified Coating Inspection is normally offset by :

Lower Application Costs

Lower Supervision Costs

Lower Coating Life Cycle Costs

Lower Safety Enforcement Costs

5.

MULTIPLE SELECT QUESTION

20 sec • 1 pt

When conducting inspections the Inspector should not follow which standards:

NACE and SSPC standards in North America

ISO standards in Europe and Asia

Australian standards in Australia

The specified standards

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The coating applicator has ignored a enface preparation hold point and applied coating over the surface without a sign off from you as the inspector.

Your FIRST preferred course of action is to:

Stop the job

Require the Applicator to remove the coating

Advise the Owner and write a Non-Conformance report

Ignore the situation

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

From a corrosion perspective, the main difference between Ferrous and Non-Ferrous Metals is :

Cost

Iron Content

Appearance

Safety

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?