Pop Quiz APD

Pop Quiz APD

University

11 Qs

quiz-placeholder

Similar activities

GLS290 Aerial Camera

GLS290 Aerial Camera

University

10 Qs

Psych drugs

Psych drugs

University

14 Qs

Freight Rate

Freight Rate

University

16 Qs

Global Urban Farming

Global Urban Farming

University

10 Qs

Garment Presentation

Garment Presentation

KG - Professional Development

15 Qs

Teaching as Vocation and Profession

Teaching as Vocation and Profession

University

10 Qs

Life of Jesus

Life of Jesus

KG - University

14 Qs

environmental education

environmental education

University

10 Qs

Pop Quiz APD

Pop Quiz APD

Assessment

Quiz

Other

University

Practice Problem

Medium

Created by

Dan Sam

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Samulde love?

A. Apricots

B. Burritos

C. Calamari

D. Donuts

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following documents were Simon and Chris referring to as part of the presentation?

Primary Frequency Response Requirements

2022 Draft ISP Consultation

System Strength Impact Assessment Guidelines

Review of Power System Data Communication Standard

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

True or False, the 'do no harm' obligation was introduced in the 2023 SSIAG?

True.

False.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many new GPS clauses have been added to the S5.2.5 schedule of the NER?

None

One

Two

Three

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

True or False, the most recent NER available on the internet now captures the two new clauses?

True.

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

SSC stands for what?

A. System Strength Consultant

B. System Shortfall Charge

C. System Short Circuit

D. System Strength Charge

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Chris' calculated example, what was a possible worst case scenario a proponent with a 100MW farm could pay in system strength charge?

A. ~3.1 million / year

B. ~4.7 million / year

C. ~5.6 million / year

D. ~5.6 million / 5 years

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?