FD integration system comparison

FD integration system comparison

Professional Development

10 Qs

quiz-placeholder

Similar activities

婚禮問答遊戲

婚禮問答遊戲

Professional Development

10 Qs

Servicio de Vinos I

Servicio de Vinos I

Professional Development

13 Qs

About SFBT

About SFBT

Professional Development

11 Qs

Simulasi Semifinal

Simulasi Semifinal

KG - Professional Development

10 Qs

Fusionex - Google Cloud KL Summit 2019 Quiz

Fusionex - Google Cloud KL Summit 2019 Quiz

Professional Development

7 Qs

科学 PAK21 PBL

科学 PAK21 PBL

KG - Professional Development

8 Qs

量身打造的體重管理策略

量身打造的體重管理策略

Professional Development

8 Qs

113-1防災+保險+ROTC+租屋

113-1防災+保險+ROTC+租屋

Professional Development

15 Qs

FD integration system comparison

FD integration system comparison

Assessment

Quiz

Specialty

Professional Development

Medium

Created by

Calix Huang

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

關於故障檢測集成系統 (FDIS) 的目標,以下哪項陳述是不正確的?

Integrate all Fault Detection (FD) applications into single platform.

Including Unified Variable Analysis (UVA) management or full trace analytics

Retire Enterprise Equipment Engineering (E3)

Integration of workflows and processes

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

為了實現統一變量分析(UVA)管理功能,(FDIS)部署了以下哪些功能? (多選)

UVA Search

UVA chart display

Alarm Rule Simulation

Limit change workflow

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

FDIS 的正確別名是什麼?

Fault Detection Integration System

FDC web Integration System

FD Integrated System

Fault Detection Image System

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

對於Full Trace Analytics 排除列表,哪種描述是正確的?

Process type tied to non-processing chamber.

Trace that are not consistent from wafer within the same process

Tunable parameters

Process type with no expected SVID data collection

All of them

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

對於Full Trace Analytics 排除列表,哪種描述是正確的?

Coverage on Critical windows only

Does not have OCAP interdiction.

All sensors set in E3 FDC process type.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

FDC UVA pattern何者為正確7 種chart type?

Stepped

Cyclical

PM/ CM Drifting

Steady

All of them

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

關於故障檢測集成系統 (FDIS) 的目標,以下哪項陳述是不正確的?

FDIS stands for Fault Detection Integration System

Current Full trace analytics is including RDA, Metro

The current UVA limit optimization calculation has pattern recognition.


The trace overlay in FDIS has customizable chart splitting and legend selection.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?