1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
RISK MANAGEMENT IS
•The process of evaluating the risks to safety and health arising from hazards at work
•The procedure associated with identifying a hazard, assessing the risk, putting in place control measures, and reviewing outcomes
•Combined likelihood of a hazardous event occurring during a specific period or in specified circumstances and severity of injury or damage to persons, property, the environment, or any combination.
LIKELIHOOD OF INCIDENT
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
HIERARCHY OF CONTROL IS
•Source or situation that could cause human injury or illness, property damage, environmental damage, or a combination of these.
•Process of implementing measures to reduce the risk associated
•with a hazard.
•The established priority order for the types of measures to be
used to control risks.
•The identification of undesirable events that could trigger the hazard and their mechanism.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
WHAT IS RISK?
an event likely to occur within the specific period or in specified circumstances.
outcome from an event such as severity of injury or health of people, or damage to property, or insult to environment, or any combination of those caused by the event.
•The process of evaluating the risks to safety and health arising from hazards at work
ØRisk is the combination of the likelihood and severity of a specified hazardous event occurring.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
THE FOLLOWING IS RISK MANAGEMENT PRINCIPLES EXCEPT
INCREASE COST OF MITIGATION
ALLIGN RISK MANAGEMENT WITH BUSINESS STRATEGY
DRIVE DECISION MAKING
BUILD A RISK ADDRESSING CULTURE
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
WHICH OF THE FOLLOWING IS NOT THE STEP IN RISK ASSESSMENT?
ASSESSING THE HAZARD
COMPLYING WITH THE LAW
PROTECTING BUSINESS
PROTECTING WORKERS
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
WHICH OF THE FOLLOWING IS NOT TRUE REGARDING PPE?
PPE IS ACCEPTABLE WHEN ENGINEERING CONTROLS ARE NOT FEASIBLE
WHILE ENGINEERING CONTROLS ARE BEING DEVELOPED
WHEN ADMINISTRATIVE CONTROLS AND SAFE WORK PRACTICES DO NOT PROVIDE SUFFICIENT PROTECTION
PPE IS THE FIRST OPTION FOR CONTROL MEASURES
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?