OPM538 RISK MANAGEMENT

Authored by DR SAAT

Business

University

Used 8+ times

OPM538 RISK MANAGEMENT
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

RISK MANAGEMENT IS

•The process of evaluating the risks to safety and health arising from hazards at work

•The procedure associated with identifying a hazard, assessing the risk, putting in place control measures, and reviewing outcomes

•Combined likelihood of a hazardous event occurring during a specific period or in specified circumstances and severity of injury or damage to persons, property, the environment, or any combination.

LIKELIHOOD OF INCIDENT

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

HIERARCHY OF CONTROL IS

•Source or situation that could cause human injury or illness, property damage, environmental damage, or a combination of these.

•Process of implementing measures to reduce the risk associated

•with a hazard.

•The established priority order for the types of measures to be
used to control risks.

•The identification of undesirable events that could trigger the hazard and their mechanism.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

WHAT IS RISK?

an event likely to occur within the specific period or in specified circumstances.

outcome from an event such as severity of injury or health of people, or damage to property, or insult to environment, or any combination of those caused by the event.

•The process of evaluating the risks to safety and health arising from hazards at work

ØRisk is the combination of the likelihood and severity of a specified hazardous event occurring.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

THE FOLLOWING IS RISK MANAGEMENT PRINCIPLES EXCEPT

INCREASE COST OF MITIGATION

ALLIGN RISK MANAGEMENT WITH BUSINESS STRATEGY

DRIVE DECISION MAKING

BUILD A RISK ADDRESSING CULTURE

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

WHICH OF THE FOLLOWING IS NOT THE STEP IN RISK ASSESSMENT?

ASSESSING THE HAZARD

COMPLYING WITH THE LAW

PROTECTING BUSINESS

PROTECTING WORKERS

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

WHICH OF THE FOLLOWING IS NOT TRUE REGARDING PPE?

PPE IS ACCEPTABLE WHEN ENGINEERING CONTROLS ARE NOT FEASIBLE

WHILE ENGINEERING CONTROLS ARE BEING DEVELOPED

WHEN ADMINISTRATIVE CONTROLS AND SAFE WORK PRACTICES DO NOT PROVIDE SUFFICIENT PROTECTION

PPE IS THE FIRST OPTION FOR CONTROL MEASURES

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?