Search Header Logo

N5 3.3 Productions Methods

Authored by C Roy

Business

10th Grade

Used 1+ times

N5 3.3 Productions Methods
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

DROPDOWN QUESTION

1 min • 1 pt

Job production involves making ​ (a)   products based on customer ​ (b)   . Each job is ​ (c)   and finished before moving on to the next ​ (d)   .

one-off
specifications
started
product
many
research
group

2.

DROPDOWN QUESTION

1 min • 1 pt

Batch production is when ​ (a)   of ​ (b)   products are produced. Machinery is stopped, ​ (c)   , and adjusted before being used for a ​ (d)   batch.

groups
similar
cleaned
different
batches
identical
sold

3.

DROPDOWN QUESTION

1 min • 1 pt

Flow production is a ​ (a)   process is used and goods move along a ​ (b)   line from beginning to end. ​ (c)   volumes can be made in a short period. Each product is ​ (d)   .

continuous
production
Large
identical
slow
straight
small
similar

4.

DROPDOWN QUESTION

1 min • 1 pt

Job production means higher ​ (a)   satisfaction because products are made to their ​ (b)   . It also means ​ (c)   employees because they produce a good from start to finish.

customer
requirements
motivated
employee
price
demotivated

5.

DROPDOWN QUESTION

1 min • 1 pt

Job production has high ​ (a)   costs because ​ (b)   workers are paid more. There are more likely to be issues with ​ (c)   because of ​ (d)   error in production.

unit
skilled
quality
human
overhead
the
costs
machine

6.

DROPDOWN QUESTION

1 min • 1 pt

Batch production means more customers can be ​ (a)   because products are slightly ​ (b)   . It is also lower ​ (c)   that job production because ​ (d)   is used in production.

targetted
different
cost
equipment
cheaper
people

7.

DROPDOWN QUESTION

1 min • 1 pt

Batch production can mean ​ (a)   between batches because machinery has to be ​ (b)   . It can have a high ​ (c)   cost because of the need for machinery.

delays
stopped
initial
breakdowns
sold
running

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?