Choke Control Panel

Choke Control Panel

Professional Development

10 Qs

quiz-placeholder

Similar activities

Talk-o-Tuesday: Episodes 1-4 Recap

Talk-o-Tuesday: Episodes 1-4 Recap

Professional Development

10 Qs

Chapter 5 Cross-cultural negotiation and decision making

Chapter 5 Cross-cultural negotiation and decision making

Professional Development

15 Qs

Stakeholders

Stakeholders

10th Grade - Professional Development

15 Qs

IntAcc1.3 - Investments in Debt and Equity Securities

IntAcc1.3 - Investments in Debt and Equity Securities

University - Professional Development

13 Qs

Unit 5: Collate Training Feedback (TAN)

Unit 5: Collate Training Feedback (TAN)

Professional Development

15 Qs

SSIHM C2

SSIHM C2

University - Professional Development

13 Qs

Quizzical series- Principles of management

Quizzical series- Principles of management

University - Professional Development

10 Qs

ERP 1

ERP 1

University - Professional Development

15 Qs

Choke Control Panel

Choke Control Panel

Assessment

Quiz

Business

Professional Development

Medium

Created by

Will Henry

Used 10+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When connecting the control panel to the rig air compressor, it is important to pay attention to...

the air pressure gauge.

the hydraulic pressure gauge.

the hydraulic fluid levels.

the accumulator.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

While connecting any high-pressure hose, it is important to always use the _______ for safety.

whip check

check valve

ball valve

pressure gauge

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When rigging up the control panel it is important to...

secure the hoses on the bar with tape or a rope before using a control decent to the ground without a spotter.

secure the hoses on the bar with tape or a rope before using a control decent to the ground.

secure the hoses on the bar with tape or a rope before using a control decent to the ground with a spotter that has not secured the area.

secure the hoses on the bar with tape or a rope before using a control decent to the ground with a spotter that has secured the area with warning tape.

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In order to purge the hydraulic lines of hydraulic fluid using air pressure from the control panel, you will need to open...

the small pump and bleed off valve.

the bleed off valve and the accumulator.

the large pump, accumulator, and the bleed off valve.

the large pump and bleed off valve.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

After you fill the accumulator tanks with hydraulic fluid, which valve should NOT be left open?

The ball valve near the hydraulic fluid tank.

The large pump valve.

The bleed off valve.

The small pump valve.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The Iron Horse Tools Choke & Panel operates as a _____________.

closed loop system

well oiled machine

hydraulic system

non of the above

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The PI cord connects to the transducers.

True

False

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?