Beverage EBS Reason Codes
Quiz
•
Business
•
Professional Development
•
Practice Problem
•
Easy
Christina Jauregui
Used 4+ times
FREE Resource
Enhance your content in a minute
6 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
A driver arrived and is on standby due to no product. The FG Planner requested a SKU change to be completed. The driver is not willing to wait due to the delay, and the shipment has to be rescheduled. Which reason code should be used for a scenario where a driver is on standby due to no product, and the FG Planner requests a SKU change, resulting in the need to reschedule the shipment?
09-NIAGARA-PLANNING (Planning and Brand Manufacturing)
10-NIAGARA-MANUFACTURING DELAY
06-NIAGARA-INVENTORY INACCURACY
11-NIAGARA-QUALITY HOLD
Answer explanation
The correct reason code for this scenario is A) 09-NIAGARA-PLANNING (Planning and Brand Manufacturing). This reason code applies when there are system errors relating to the planning team or planning tools, such as deployment transfers or unrequested item changes causing delays in shipments.
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The driver arrives for pickup, and the CSO team confirms that the product is not available due to production delays. The shipment must be pulled for rescheduling. Which reason code should be used when the product is not available for pickup due to production delays, necessitating the rescheduling of the shipment?
10-NIAGARA-MANUFACTURING DELAY
06-NIAGARA-INVENTORY INACCURACY
11-NIAGARA-QUALITY HOLD
12-NIAGARA-RAW MATERIAL ISSUE cosdefdsdfdsafd12-NIAGARA-RAW MATERIAL ISSUE
Answer explanation
The correct reason code for this scenario is A) 10-NIAGARA-MANUFACTURING DELAY. This reason code applies when a line fails to meet throughput expectations due to mechanical failures, delays, or other issues, resulting in product unavailability when requested for pickup.
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Systematic inventory does not align with what is physically on hand, causing a delay in loading the product. Drivers are on standby, and future loads will need to be pulled. Which reason code should be used when a delay occurs due to inventory inaccuracies, impacting product loading and necessitating future load adjustments?
06-NIAGARA-INVENTORY INACCURACY
10-NIAGARA-MANUFACTURING DELAY
11-NIAGARA-QUALITY HOLD
12-NIAGARA-RAW MATERIAL ISSUE
Answer explanation
The correct reason code for this scenario is A) 06-NIAGARA-INVENTORY INACCURACY. This reason code is applied when an order is rescheduled due to discrepancies between systematic inventory and physical inventory, affecting the loading process.
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Shortage due to quality hold at the warehouse, causing a delay in releasing the product. Impacted loads will need to be pulled or rescheduled. Which reason code should be used when a quality hold at the warehouse causes a shortage, leading to delayed releases and impacting subsequent loads?
10-NIAGARA-MANUFACTURING DELAY
06-NIAGARA-INVENTORY INACCURACY
11-NIAGARA-QUALITY HOLD
12-NIAGARA-RAW MATERIAL ISSUE
Answer explanation
The correct reason code for this scenario is C) 11-NIAGARA-QUALITY HOLD. This reason code applies to any product holds due to quality issues, affecting the release of the product and necessitating load adjustments.
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Due to the lack of raw materials, a production line cannot operate, leading to future load adjustments.
Which reason code should be used when scheduled production is delayed due to unavailability of raw materials, resulting in the inability to operate the production line?
10-NIAGARA-MANUFACTURING DELAY
06-NIAGARA-INVENTORY INACCURACY
11-NIAGARA-QUALITY HOLD
12-NIAGARA-RAW MATERIAL ISSUE
Answer explanation
The correct reason code for this scenario is C) 11-NIAGARA-QUALITY HOLD. This reason code applies to any product holds due to quality issues, affecting the release of the product and necessitating load adjustments.
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
One of our beverage customers did not provide raw materials to produce their product, leading to delayed orders or shipments. Which reason code should be used when orders or shipments are delayed due to late delivery of raw materials procured by Niagara's customer?
10-NIAGARA-MANUFACTURING DELAY
06-NIAGARA-INVENTORY INACCURACY
11-NIAGARA-QUALITY HOLD
37-CUST-SUPPLIED RAWS
Answer explanation
The correct reason code for this scenario is D) 37-CUST-SUPPLIED RAWS. This reason code applies when orders or shipments are delayed due to the late delivery of raw materials provided by Niagara's customer.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
10 questions
Recap
Quiz
•
Professional Development
10 questions
AAT L3 Tax Processes Workbook Chp1
Quiz
•
Professional Development
11 questions
After the Interview: Formulas for Career Success
Quiz
•
7th Grade - Professio...
10 questions
Operational Risk Management Questionnaire
Quiz
•
Professional Development
10 questions
BA Revision Session 4 - Business Fundamentals
Quiz
•
Professional Development
10 questions
CXO13 WEEK 10 REVISION
Quiz
•
University - Professi...
10 questions
AES Quizz 1
Quiz
•
Professional Development
10 questions
( BDP ) AGL Set 1
Quiz
•
Professional Development
Popular Resources on Wayground
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
22 questions
fractions
Quiz
•
3rd Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade
15 questions
Equivalent Fractions
Quiz
•
4th Grade
20 questions
Figurative Language Review
Quiz
•
6th Grade
Discover more resources for Business
10 questions
How to Email your Teacher
Quiz
•
Professional Development
6 questions
3RD GRADE DECLARATION OF INDEPENDENCE EXIT TICKET
Quiz
•
Professional Development
19 questions
Black History Month Trivia
Quiz
•
6th Grade - Professio...
22 questions
Multiplying Exponents with the Same Base
Quiz
•
9th Grade - Professio...
40 questions
Flags of the World
Quiz
•
KG - Professional Dev...
