Responsibility (API 936)

Responsibility (API 936)

Professional Development

10 Qs

quiz-placeholder

Similar activities

Quiz 01 Prelim Crim Prof 315

Quiz 01 Prelim Crim Prof 315

University - Professional Development

15 Qs

AMPP TWILIGHT IMCORSS

AMPP TWILIGHT IMCORSS

Professional Development

10 Qs

Motorcycle

Motorcycle

Professional Development

10 Qs

Compliance

Compliance

Professional Development

12 Qs

Evaluación del taller para inspectores internos

Evaluación del taller para inspectores internos

Professional Development

7 Qs

Back to School Trivia!

Back to School Trivia!

Professional Development

11 Qs

Fast Pitch Pitching

Fast Pitch Pitching

Professional Development

11 Qs

Chicago Plumbing Code Article 7 Sanitary Drainage

Chicago Plumbing Code Article 7 Sanitary Drainage

Professional Development

15 Qs

Responsibility (API 936)

Responsibility (API 936)

Assessment

Quiz

Specialty

Professional Development

Hard

Created by

Herlina Damayanti

Used 10+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

CONTRACTOR’S EXECUTION PLAN DETAILS to be submitted to the owner for his approval

before the start of work shall include all of the following items except:

Designation of responsible parties, Insp hold points (req’d advance notifications to inspector)

Curing (incl. any curing compounds used) & Dryout procedures for completed lining systems

Procedures for material qualifications/storage, applicator qualifications, installation and QC

Proposed drawings and details related to the execution of the work

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following items is NOT a Contractor responsibility per API 936 Standard?

Submit exceptions/substitutions/deviations from requirements of execution plans to owner

Submit exceptions/substitutions/deviations from requirements of API 936 standard to owner

Submit exceptions/substitutions/deviations from requirements of other documents to owner

Assure that owner's approval shall be secured after implementation of the changes

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following items is NOT a Contractor responsibility per API 936 Standard?

A) Scheduling of material qual tests and delivery of those materials and test results to the site

Scheduling/work execution to qualify all equip/personnel required to complete installation

Preparation/identification of all testing samples & timely delivery to the testing laboratory

Advance notification to the inspector of time/location where work will take place

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Contractor shall provide the Inspector verified documentation of installation records

including all of the following items except:

Product being applied, pallet code numbers/location where applied, Install. crew members

Mixing and/or gunning equipment utilized, fiber/water %, mixing details (time/temp/aging)

Location/identity of samples taken for installation QC, shell temps, Weather conditions

Dryout records and Compliance Data sheet in accordance with Annex C requirements

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Contractor responsibilities include accountability for installed refractories meeting

specified standards, including as-installed testing results and:

Lining thickness tolerance limits set by the owner

Lining thickness tolerance limits set by the inspector

Lining thickness tolerance limits set by the manufacturer

Lining thickness tolerance limits as per detailed execution plan

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Inspector shall be responsible to ensure material/applicator qualification test results are:

Fully documented

Completed/accepted

Witnessed 100%

None of these

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The inspector shall be responsible to monitor qualification, production work and dryout

(when applicable) conducted by the manufacturer(s) and contractor to ensure compliance:

With job specifications and agreed-to quality practices

With detailed execution plan and agreed-to quality practices

C) With Contractor’s quality plan and agreed-to quality practices

None of these are correct

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?