Search Header Logo

Responsibility (API 936)

Authored by Herlina Damayanti

Specialty

Professional Development

Used 10+ times

Responsibility (API 936)
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

CONTRACTOR’S EXECUTION PLAN DETAILS to be submitted to the owner for his approval

before the start of work shall include all of the following items except:

Designation of responsible parties, Insp hold points (req’d advance notifications to inspector)

Curing (incl. any curing compounds used) & Dryout procedures for completed lining systems

Procedures for material qualifications/storage, applicator qualifications, installation and QC

Proposed drawings and details related to the execution of the work

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following items is NOT a Contractor responsibility per API 936 Standard?

Submit exceptions/substitutions/deviations from requirements of execution plans to owner

Submit exceptions/substitutions/deviations from requirements of API 936 standard to owner

Submit exceptions/substitutions/deviations from requirements of other documents to owner

Assure that owner's approval shall be secured after implementation of the changes

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following items is NOT a Contractor responsibility per API 936 Standard?

A) Scheduling of material qual tests and delivery of those materials and test results to the site

Scheduling/work execution to qualify all equip/personnel required to complete installation

Preparation/identification of all testing samples & timely delivery to the testing laboratory

Advance notification to the inspector of time/location where work will take place

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Contractor shall provide the Inspector verified documentation of installation records

including all of the following items except:

Product being applied, pallet code numbers/location where applied, Install. crew members

Mixing and/or gunning equipment utilized, fiber/water %, mixing details (time/temp/aging)

Location/identity of samples taken for installation QC, shell temps, Weather conditions

Dryout records and Compliance Data sheet in accordance with Annex C requirements

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Contractor responsibilities include accountability for installed refractories meeting

specified standards, including as-installed testing results and:

Lining thickness tolerance limits set by the owner

Lining thickness tolerance limits set by the inspector

Lining thickness tolerance limits set by the manufacturer

Lining thickness tolerance limits as per detailed execution plan

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Inspector shall be responsible to ensure material/applicator qualification test results are:

Fully documented

Completed/accepted

Witnessed 100%

None of these

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The inspector shall be responsible to monitor qualification, production work and dryout

(when applicable) conducted by the manufacturer(s) and contractor to ensure compliance:

With job specifications and agreed-to quality practices

With detailed execution plan and agreed-to quality practices

C) With Contractor’s quality plan and agreed-to quality practices

None of these are correct

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?