Responsibility (API 936)
Authored by Herlina Damayanti
Specialty
Professional Development
Used 10+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
CONTRACTOR’S EXECUTION PLAN DETAILS to be submitted to the owner for his approval
before the start of work shall include all of the following items except:
Designation of responsible parties, Insp hold points (req’d advance notifications to inspector)
Curing (incl. any curing compounds used) & Dryout procedures for completed lining systems
Procedures for material qualifications/storage, applicator qualifications, installation and QC
Proposed drawings and details related to the execution of the work
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following items is NOT a Contractor responsibility per API 936 Standard?
Submit exceptions/substitutions/deviations from requirements of execution plans to owner
Submit exceptions/substitutions/deviations from requirements of API 936 standard to owner
Submit exceptions/substitutions/deviations from requirements of other documents to owner
Assure that owner's approval shall be secured after implementation of the changes
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following items is NOT a Contractor responsibility per API 936 Standard?
A) Scheduling of material qual tests and delivery of those materials and test results to the site
Scheduling/work execution to qualify all equip/personnel required to complete installation
Preparation/identification of all testing samples & timely delivery to the testing laboratory
Advance notification to the inspector of time/location where work will take place
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Contractor shall provide the Inspector verified documentation of installation records
including all of the following items except:
Product being applied, pallet code numbers/location where applied, Install. crew members
Mixing and/or gunning equipment utilized, fiber/water %, mixing details (time/temp/aging)
Location/identity of samples taken for installation QC, shell temps, Weather conditions
Dryout records and Compliance Data sheet in accordance with Annex C requirements
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Contractor responsibilities include accountability for installed refractories meeting
specified standards, including as-installed testing results and:
Lining thickness tolerance limits set by the owner
Lining thickness tolerance limits set by the inspector
Lining thickness tolerance limits set by the manufacturer
Lining thickness tolerance limits as per detailed execution plan
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Inspector shall be responsible to ensure material/applicator qualification test results are:
Fully documented
Completed/accepted
Witnessed 100%
None of these
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The inspector shall be responsible to monitor qualification, production work and dryout
(when applicable) conducted by the manufacturer(s) and contractor to ensure compliance:
With job specifications and agreed-to quality practices
With detailed execution plan and agreed-to quality practices
C) With Contractor’s quality plan and agreed-to quality practices
None of these are correct
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?