cold water 1 revision

cold water 1 revision

Professional Development

23 Qs

quiz-placeholder

Similar activities

Phase 2 revision 2

Phase 2 revision 2

Professional Development

20 Qs

cold water 3 revision

cold water 3 revision

Professional Development

18 Qs

Chapter III: Steam Boiler Fittings

Chapter III: Steam Boiler Fittings

Professional Development

25 Qs

Plumbing and Heating MCQ Quiz 9289 Ph2 Pt2

Plumbing and Heating MCQ Quiz 9289 Ph2 Pt2

Professional Development

23 Qs

GMJ 6035 Hot water A

GMJ 6035 Hot water A

Professional Development

20 Qs

Quiz Webinar Pembangkit Series 6-Pengoperasain Turbin Uap-Part 2

Quiz Webinar Pembangkit Series 6-Pengoperasain Turbin Uap-Part 2

Professional Development

20 Qs

Braxton And lem blox fruits quiz

Braxton And lem blox fruits quiz

KG - Professional Development

19 Qs

Dutch Mill - Operator Competence

Dutch Mill - Operator Competence

Professional Development

25 Qs

cold water 1 revision

cold water 1 revision

Assessment

Quiz

Other

Professional Development

Easy

Created by

Musa Khan

Used 43+ times

FREE Resource

23 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing a new indirect cold water system, which of the following should

happen, according to the Water Regulations?

One tap, normally the kitchen sink, should be drawn directly from the

supply pipe

One tap, normally the kitchen sink, should have a dedicated distribution pipe

from the storage cistern

Mixer taps will require double check valves

Mixer taps should never be installed due to the pressure differences.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to BS6700 and the Water Regulations, a drain off valve should be

installed:

At every draw off point

At every low point in the system

At every high point in the system

Above the cold water storage cistern.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pin holing in copper pipework is commonly caused by:

Hard water

Alkaline water

Acidic water

Pure water

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

While installing pipework in a property, you are called off site to another job. What

would be the correct course of action with any open-ended pipework?

Place a warning label on every open end

Warn the customer not to interfere with any pipework

Cap off with a push fit fitting

Be as quick as you can to return

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

One of the major problems when leaving a dead leg in a cold water pipe is:

Possible bacterial growth

Electrolytic corrosion

Pitting of pipework

Reduction in water flow

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The use of WRAS approved fittings when installing cold water pipework is:

A legal requirement

To be corrosion resistant

All of the above.

o avoid contamination

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On the completion of a new cold water installation, the system has been proven

sound. What would the next course of action be?

Visual inspection with the customer

Prepare the benchmark certificate

Flush the pipework out then hand over to the customer

Hand over to the customer

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?