1. what is the difference between normal costing and actual costing?
AA025 lecture

Quiz
•
Other
•
University
•
Hard
lilly eve
Used 1+ times
FREE Resource
6 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A. direct material
B. manufacturing cost
C. applied manufacturing overhead
D. direct labour
Answer explanation
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
2. which components are true for normal costing
A. actual direct material + actual direct labour + actual manufacturing overhead
B. actual direct material - actual direct labour + actual manufacturing overhead
C. actual direct material + actual direct labour + applied manufacturing overhead /
D. actual direct material + actual direct labour - applied manufacturing overhead
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
3. which statement is true about actual costing
A. The actual cost of direct materials and direct labour involved and applied manufacturing overhead cost
B. avoid fluctuation problems of cost per unit output in every period that’s caused by multiple volumes of production
units in a certain period.
C. Uses actual costs of direct materials, direct labour and applied manufacturing overheads to numerous jobs supported at a predetermined overhead rate.
D. The actual cost of direct materials and direct labour involved and actual manufacturing overhead cost applied or allocated to several types of jobs.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
4. ....... is calculated of overhead cost allocated to a specific job estimation based on actual activity base.
a.actual overhead
b. Applied overhead
c. Budgeted overhead
d. under applied overhead
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
5. which of the following is the correct formula for predetermined overhead cost (POR)
A. actual annual overhead cost/actual annual operating activity
B. budgeted annual overhead cost/ budgeted annual operating activity
C. actual annual overhead cost/budgeted annual operating activity
D. budgeted annual operating activity/budgeted annual overhead cost
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
6. which one is the most correct
A. applied overhead > actual overhead = over-applied overhead
B. applied overhead < actual overhead = over-applied overhead
C. applied overhead > actual overhead = under-applied overhead
D. none of above
Similar Resources on Quizizz
8 questions
JOB ORDER COSTING

Quiz
•
University
10 questions
Quiz Akuntansi Manajemen Sebelum MID

Quiz
•
University
9 questions
Exam 1- formula review

Quiz
•
University
9 questions
Ch. 8 Budgeting

Quiz
•
University
10 questions
Classify cost ch01

Quiz
•
University
8 questions
Sales and Inventory Data Analysis Quiz

Quiz
•
9th Grade - University
10 questions
TOPIC 9 PROCESS COSTING

Quiz
•
University
8 questions
Overhead allocation, apportionment and absorption

Quiz
•
University
Popular Resources on Quizizz
15 questions
Character Analysis

Quiz
•
4th Grade
17 questions
Chapter 12 - Doing the Right Thing

Quiz
•
9th - 12th Grade
10 questions
American Flag

Quiz
•
1st - 2nd Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
30 questions
Linear Inequalities

Quiz
•
9th - 12th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
18 questions
Full S.T.E.A.M. Ahead Summer Academy Pre-Test 24-25

Quiz
•
5th Grade
14 questions
Misplaced and Dangling Modifiers

Quiz
•
6th - 8th Grade