1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the required head for a single-story building to supply water directly to all water supply fittings?

5 meters

7 meters

10 meters

12 meters

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

For a double-story building (ground + one), what is the required head for water supply?

7 meters

12 meters

15 meters

5 meters

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which type of system is used when the municipal water supply pressure is sufficient for distribution?

Pumped system

Direct system

Gravity system

Mixed system

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In a direct system, what is NOT required for water distribution?

Roof tanks

Ventilation pipes

  • Additional pumps

outlet in tanks

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the purpose of the duplicate pump sets in a pump house?

Faster water flow

Reducing pressure

One serves as a standby

Increasing water temperature

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the typical storage period designed for ground or underground reservoirs?

1 day

2-3 days

4-5 days

7 days

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

How high above ground level should overflow outlets of reservoirs be?

5 cm

10 cm

15 cm

20 cm

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?