6035DRAINPPT9

6035DRAINPPT9

12th Grade

37 Qs

quiz-placeholder

Similar activities

Dorsal Muscles of Cat Hot Spot Practice

Dorsal Muscles of Cat Hot Spot Practice

12th Grade

41 Qs

Kitchen Safety and Equipment Midterm

Kitchen Safety and Equipment Midterm

12th Grade - University

40 Qs

Basic Residential Electrical

Basic Residential Electrical

11th - 12th Grade

41 Qs

RHS LAX Offensive Terms

RHS LAX Offensive Terms

10th - 12th Grade

39 Qs

chapter 41,42cdx

chapter 41,42cdx

12th Grade - University

40 Qs

EMT Trauma Unit Vocab

EMT Trauma Unit Vocab

11th Grade - Professional Development

36 Qs

APST CH34 Intro, Entrance Panel & Wiring Boxes

APST CH34 Intro, Entrance Panel & Wiring Boxes

KG - 12th Grade

34 Qs

Hip and Pelvis Review

Hip and Pelvis Review

11th - 12th Grade

40 Qs

6035DRAINPPT9

6035DRAINPPT9

Assessment

Quiz

Other

12th Grade

Hard

Created by

William Heron

FREE Resource

37 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What should you inspect the facia boards for before starting work on rainwater system installation?

Paint color

Straightness and level

Material type

Length

2.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Why is it important to inspect the underfelt of the roof before installing a rainwater system?

To check for color consistency

To ensure it is dry

To look for any rips or deterioration

To measure its thickness

3.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What tool is suggested for ensuring a straight line during the installation of rainwater systems?

String line

Bradawl

File

Hacksaw

4.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Which tool would be used to make precise holes or marks in the installation process of rainwater systems?

String level

Claw hammer

Bradawl

File

5.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What is the first step in installing a rainwater system according to the document?

Measure the overall length and work out the 1:600 fall.

Establish the position of the gutter outlet.

Tie the string line on the first fascia bracket.

Hold the running outlet on the fascia board and over the drain.

6.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What should be done after establishing the high position of the gutter?

Measure the overall length and work out the 1:600 fall.

Tie the string line on the first fascia bracket.

Hold the running outlet on the fascia board and over the drain.

Fix the first fascia bracket at this point.

7.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What is the purpose of tying the string line on the first fascia bracket?

To measure the overall length of the gutter.

To establish the high position of the gutter.

To ensure the gutter is aligned with the centre of the drain.

To work out the 1:600 fall.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?