9189PH2CHPPT14PIPE INSTALL

9189PH2CHPPT14PIPE INSTALL

12th Grade

29 Qs

quiz-placeholder

Similar activities

Above ground drainage

Above ground drainage

9th Grade - Professional Development

30 Qs

Framing Review

Framing Review

10th - 12th Grade

25 Qs

IRM Unit 112 - WS 3 Cold water systems

IRM Unit 112 - WS 3 Cold water systems

12th Grade

25 Qs

Chapter 20: Construction Technology

Chapter 20: Construction Technology

KG - University

25 Qs

ID- Roofs, Architectural Elements, & Construction

ID- Roofs, Architectural Elements, & Construction

9th - 12th Grade

28 Qs

UNIT : Floors  Quiz

UNIT : Floors Quiz

12th Grade

31 Qs

Floor Systems

Floor Systems

10th - 12th Grade

25 Qs

Framing Structures Review

Framing Structures Review

12th Grade

32 Qs

9189PH2CHPPT14PIPE INSTALL

9189PH2CHPPT14PIPE INSTALL

Assessment

Quiz

Other

12th Grade

Hard

Created by

William Heron

FREE Resource

29 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

For what type of installations are low carbon steel pipes and fittings rarely used?

Commercial systems

Industrial systems

Domestic installations

Outdoor installations

2.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Media Image

Identify the tool shown in the image used for LCS pipework installations.

Manual press tool

Electrical press tool

Hydraulic press tool

Pneumatic press tool

3.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Why are polybutylene pipes and fittings becoming the material of choice for new-build installations?

Because they are the cheapest option available

Due to their durability and strength

Because of their flexibility and ease of installation

They are the only materials that can be used for plumbing

4.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What must be used to make connections to any heat-producing appliance?

Polybutylene for the entire connection

Copper for the metre nearest the appliance

Plastic connectors throughout

Steel pipes for better heat resistance

5.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What combination is acceptable at the heat emitter?

Copper only

Polybutylene only

A combination of polybutylene and copper

Steel and polybutylene

6.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

At what temperatures do the flow and return pipework expand and contract?

Flow at 50°C and return at 70°C

Flow at 70°C and return at 50°C

Both at 60°C

Both at 70°C

7.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What should be done at the installation stage of pipework to account for expansion and contraction?

Tighten all the joints securely

Make provision for expansion and contraction

Install the pipes without any notches

Use polybutylene pipe only

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?