Quiz topic 2:  Resource management

Quiz topic 2: Resource management

11th Grade

16 Qs

quiz-placeholder

Similar activities

The Engineering Design Process Review

The Engineering Design Process Review

9th - 12th Grade

20 Qs

Design C Summative

Design C Summative

7th Grade - University

15 Qs

Principles of Design

Principles of Design

9th - 12th Grade

15 Qs

Yearbook Design/Walsworth Quiz

Yearbook Design/Walsworth Quiz

9th - 12th Grade

20 Qs

Graphic Design Fundamentals

Graphic Design Fundamentals

11th - 12th Grade

17 Qs

ID 1 1.01

ID 1 1.01

9th - 12th Grade

20 Qs

PLTW Engineering Notebook

PLTW Engineering Notebook

9th - 12th Grade

15 Qs

Distinguish and Differentiate Engineering Fields

Distinguish and Differentiate Engineering Fields

9th - 12th Grade

20 Qs

Quiz topic 2:  Resource management

Quiz topic 2: Resource management

Assessment

Quiz

Design

11th Grade

Hard

Created by

Daniella Lira

Used 3+ times

FREE Resource

16 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

5 sec • 1 pt

Which of the following are reasons why radical solutions for waste mitigation are unlikely to be adopted by organizations?

I. Success is not guaranteed

II. Requires considerable research and development

III. Time consuming

2.

MULTIPLE SELECT QUESTION

5 sec • 1 pt

Social and environmental factors need to be considered when obtaining renewable and non-renewable resources. Which of the following economic factors also needs to be considered?

I. Set-up cost

II. Dematerialization

III. Decommissioning

3.

MULTIPLE SELECT QUESTION

5 sec • 1 pt

The circular economy model considers which of the following issues?

I. Waste

II. Economic

III. Social

4.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

Fashion designers can develop collections with the use of virtually simulated garments. What may be an eco-design reason to include these new innovations into the fashion cycle?

A. Promotes circular economy

B. Avoids overproduction and environmental footprint

C. Avoids dematerialization

D. Promotes a linear economy

5.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

Media Image

What waste mitigation strategy is being employed by the company? Aspen Waste Systems.

"Aspen Waste practices green waste collection and disposal methods"

A. Re-engineering

B. Recycling

C. Re-using

D. Reconditioning

6.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

To redesign components or products to improve their appearance or performance is known as…

A. re-engineering

B. retro-styling

C. repairing

D. re-using

7.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

At what stage of the design cycle would system level solutions appear?

A. After conceptual design but before detailed design

B. After conceptual design and detailed design

C. Before conceptual design and detailed design

D. Before conceptual design and after detailed design

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?