APS UNIT2

APS UNIT2

Professional Development

26 Qs

quiz-placeholder

Similar activities

The Game of Definitions

The Game of Definitions

Professional Development

22 Qs

Postal Manual vol 7 test1

Postal Manual vol 7 test1

Professional Development

21 Qs

SULTAN BAGINDO 9

SULTAN BAGINDO 9

Professional Development

27 Qs

CREATIVE THINKING

CREATIVE THINKING

Professional Development

21 Qs

Wawancara PPPK

Wawancara PPPK

Professional Development

25 Qs

LG & LEGAL FOR CS

LG & LEGAL FOR CS

Professional Development

25 Qs

T1 Week 2 Review

T1 Week 2 Review

Professional Development

24 Qs

Chap5. Structuring and drafting the tender and contract

Chap5. Structuring and drafting the tender and contract

Professional Development

21 Qs

APS UNIT2

APS UNIT2

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

RIMNESH RAJAN

Used 1+ times

FREE Resource

26 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

1. In _____________ type automation system, process discrete parts in large volumes.
a. Craft Production
b. lean production
c. Detroit
d. None

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

2. The objective of Flow line automation is to reduce ________________.
a. Production rate
b. Labor cost
c. Safety
d. Efficiency

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

3. The pattern of work flow used in In-line configuration, which allow the same operator for loading & unloading is
a. Straight line
b. Circle
c. Rectangular
d. None

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

4. The ____________ configuration consists of sequence of work stations in a straight line arrangement.
a. Rotary
b. Circle
c. In-line
d. Dial type

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

5. In the ____________ configuration, the work parts are indexed around a dial.
a. Rotary
b. Rectangular
c. In-line
d. Square

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

6. In rotary indexing machine, parts are fixed on a horizontal circular table between ___________ stations.
a. Alternate
b. Successive
c. Single
d. Double

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

7. Methods of transporting work pieces on flow lines ____________________.
a. Continuous
b. Intermittent
c. Asynchronous
d. All the above

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?