UA Local 467 Chapter 25 Quizizz

UA Local 467 Chapter 25 Quizizz

12th Grade

31 Qs

quiz-placeholder

Similar activities

Chapter 11 Assessment #1

Chapter 11 Assessment #1

9th - 12th Grade

29 Qs

Routing & Switching: Introduction to Networks - Chapter 1 Exam

Routing & Switching: Introduction to Networks - Chapter 1 Exam

11th - 12th Grade

34 Qs

TED Unit 3 Review

TED Unit 3 Review

9th - 12th Grade

30 Qs

PLC REVISION

PLC REVISION

11th Grade - University

35 Qs

Testout PC Pro Chapter 5

Testout PC Pro Chapter 5

11th - 12th Grade

29 Qs

4th Quarter Quiz # 2 in ICT 4

4th Quarter Quiz # 2 in ICT 4

12th Grade

30 Qs

Chapter 1 Types and components of Computer Systems

Chapter 1 Types and components of Computer Systems

9th - 12th Grade

30 Qs

DDP Quiz #3

DDP Quiz #3

9th - 12th Grade

30 Qs

UA Local 467 Chapter 25 Quizizz

UA Local 467 Chapter 25 Quizizz

Assessment

Quiz

Instructional Technology

12th Grade

Medium

Created by

Louis Nunes

Used 22+ times

FREE Resource

31 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The ____ for a rooftop packaged unit retrofit application includes a zone temperature sensor package with override, a power supply package, the rooftop unit wiring diagram, and a riser diagram for controller addressing.

pneumatic controller

building survey

database

materials list

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Many hot water boiler systems have a ____ which controls the temperature of the water pumped through the building heating coils.

pressure valve

three-way valve

120 V control circuit

digital interface

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Most new chillers have a built-in ____.

cooling tower

water circulation system

microprocessor control panel

power supply system

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A common alternate retrofit strategy for a chiller control system is to ____.

use variable frequency drives in place of vane volume control

reset the fan static setpoint based on zone demand

install a flame safeguard controller that is compatible with the BAS communication bus

install a translator panel to allow the BAS to view and command points inside the microprocessor control panel

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A boiler control retrofit application normally consists of retrofitting an existing ____ boiler control system to a building automation system.

electromechanical

ON/OFF

digital

three-phase

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A(n) ___ is the process of upgrading building controls and mechanical systems with a building automation system.

modification

rebuild

retrofit

upgrade

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A(n) ___ is an inventory of the energy-consuming equipment in a commercial building.

building survey

materials list

energy survey

equipment list

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?