UA Local 467 Chapter 25 Quizizz

UA Local 467 Chapter 25 Quizizz

12th Grade

31 Qs

quiz-placeholder

Similar activities

Pressurization Modes

Pressurization Modes

12th Grade - University

30 Qs

OCR Cambridge National ICT LO3

OCR Cambridge National ICT LO3

KG - Professional Development

34 Qs

Supp Restraint System

Supp Restraint System

12th Grade

26 Qs

Floor Systems

Floor Systems

9th - 12th Grade

27 Qs

IED Reverse Engineering

IED Reverse Engineering

12th Grade

32 Qs

Engine Test

Engine Test

12th Grade

30 Qs

EMS (Engine Management Sistem) II

EMS (Engine Management Sistem) II

12th Grade

30 Qs

05.16

05.16

9th - 12th Grade

33 Qs

UA Local 467 Chapter 25 Quizizz

UA Local 467 Chapter 25 Quizizz

Assessment

Quiz

Instructional Technology

12th Grade

Medium

Created by

Louis Nunes

Used 22+ times

FREE Resource

31 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The ____ for a rooftop packaged unit retrofit application includes a zone temperature sensor package with override, a power supply package, the rooftop unit wiring diagram, and a riser diagram for controller addressing.

pneumatic controller

building survey

database

materials list

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Many hot water boiler systems have a ____ which controls the temperature of the water pumped through the building heating coils.

pressure valve

three-way valve

120 V control circuit

digital interface

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Most new chillers have a built-in ____.

cooling tower

water circulation system

microprocessor control panel

power supply system

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A common alternate retrofit strategy for a chiller control system is to ____.

use variable frequency drives in place of vane volume control

reset the fan static setpoint based on zone demand

install a flame safeguard controller that is compatible with the BAS communication bus

install a translator panel to allow the BAS to view and command points inside the microprocessor control panel

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A boiler control retrofit application normally consists of retrofitting an existing ____ boiler control system to a building automation system.

electromechanical

ON/OFF

digital

three-phase

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A(n) ___ is the process of upgrading building controls and mechanical systems with a building automation system.

modification

rebuild

retrofit

upgrade

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A(n) ___ is an inventory of the energy-consuming equipment in a commercial building.

building survey

materials list

energy survey

equipment list

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?