HNTec POM Isolation practical

HNTec POM Isolation practical

Professional Development

15 Qs

quiz-placeholder

Similar activities

Discovery Pixar

Discovery Pixar

Professional Development

10 Qs

Fluorides

Fluorides

Professional Development

10 Qs

Geodezja 2TiG

Geodezja 2TiG

Professional Development

20 Qs

TS5015FP_C2_Guest Cycle

TS5015FP_C2_Guest Cycle

Professional Development

15 Qs

Przekroczenie czy brak przekroczenia granic wolności słowa?

Przekroczenie czy brak przekroczenia granic wolności słowa?

Professional Development

16 Qs

Foundation Quiz

Foundation Quiz

Professional Development

10 Qs

[CBTC28] - QUẢN LÝ TÀI CHÍNH & ĐIỀU HÀNH CUỘC HỌP

[CBTC28] - QUẢN LÝ TÀI CHÍNH & ĐIỀU HÀNH CUỘC HỌP

KG - Professional Development

20 Qs

Integria - Rebuttals

Integria - Rebuttals

Professional Development

20 Qs

HNTec POM Isolation practical

HNTec POM Isolation practical

Assessment

Quiz

Specialty

Professional Development

Practice Problem

Easy

Created by

Magdalene Tan

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it necessary to isolate pumps and their motors during maintenance activities?

To increase energy consumption

To improve equipment performance

To prevent accidents and ensure safety

To speed up maintenance processes

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following activities may be exempt from the requirement of isolating pumps and motors?

Overhauling the entire pump system

Conducting routine preventive maintenance

Replacing major components of the pump

Installing a new pump in the system

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What document specifies the appropriate precautions for isolating pumps and motors?

Maintenance Schedule

Safety Manual

Permit To Work (PTW)

Employee Handbook

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step to be taken when a pump is to be attended or worked on?

Flush the pump with water

Drain the pump

Disconnect auxiliary piping

Stop the pump and close suction and discharge valves

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What precaution should be taken if the pump is to be maintained in-situ (in place)?

Open ends to be blinded off after removal of pump

Isolate valves / depressurise / spade off / disconnect all (associated) auxiliary piping

Flush the pump with water before removing to workshop

Drain the pump

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done if the pump is to be removed to the workshop?

Flush the pump with water before removing to workshop

Drain the pump

Isolate valves / depressurise / spade off / disconnect all (associated) auxiliary piping

Open ends to be blinded off after removal of pump

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is positive isolation?

Isolation with zero energy potential

Isolation with minimal energy potential

Isolation without identifying hazardous energy

Isolation with residual energy

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?