LABOUR COST

Authored by Santhosh N

Financial Education

University

Used 1+ times

LABOUR COST
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Sum total of all wages, employee benefits and payroll taxes  paid to employees by its employer is called:

Labour cost

Material cost

Overhead

None of these

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Second element of cost of production is called:

Material

Labour

Overhead

None of these

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which among the following / are the method of remuneration?

Time wage system

Piece wage system

Bonus system

All of these

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Straight piece rate system comes under:

Piece wage system

Time rate system

Bonus system

Non of these

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Rowan plan comes under:

Time wage system

Piece wage system

Bonus system

None of these

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Gantt Task Bonus Plan comes under:

Straight Piece Rate

Piece Rate with Guaranteed Time Rate

Differential Piece Rates

None of these

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Under Halsey-Weir Scheme total earnings =

T x R + 30% (S - T) R

T x R - 30% (S - T) R

T x R + 50% (S - T) R

T x R - 50% (S - T) R

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?